Similar Projects
Provide, Install, and Maintain a New 10Gb Ethernet Service Using IGO
Term Contract
Bidding
Des Moines, IA - Scott Air Force Base, IL 62225

Digital Enterprise Conduit Deployment Segment 4, Phase 2
Alteration
Bidding
West Des Moines, IA

Information Technology Services
Term Contract
Post-Bid
Waterloo, IA 50703

Burlington Community Schools - Camera Upgrades
Alteration
Post-Bid
Burlington, IA 52601

Digital Enterprise Conduit Deployment Segment 3 Phase 3
Alteration
Results
West Des Moines, IA

ImOn Ice Arena Audio System Replacement
Alteration
Results
$325,000 est. value
Cedar Rapids, IA 52404

Conduit Replacement At Southdale And Old Orchard Trailer Park
Infrastructure
Bidding
Ames, IA 50010

Radio Frequency Identification System- RFID
Alteration
Post-Bid
Less than $75,000 est. value
Pella, IA

Digital Enterprise Conduit Deployment Segment 4 Phase 1
Alteration
Results
West Des Moines, IA

Materials for Network Infrastructure Upgrade
Alteration
Post-Bid
Davenport, IA

Fiber Conduit Inter-Connect (Pink Route - Phase 1)
Alteration
Results
West Des Moines, IA

Provide, Install, and Maintain a 10Gb Ethernet Installation
Term Contract
Post-Bid
Des Moines, IA - Offutt Air Force Base, NE 50321

Fiber Conduit Inter-Connect (Orange Route - Phase 2)
Alteration
Results
West Des Moines, IA

Camp Dodge T-22 Training Area Fiber
Alteration
Post-Bid
Johnston, IA

Professional Services Network Infrastructure
Alteration
Results
Davenport, IA

Last Updated 03/03/2022 10:53 AM
Project Title

Digital Enterprise Conduit Deployment Segment 3 Phase 3

Physical Address View project details and contacts
City, State (County) State-Wide: IA
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The West Des Moines DIGITAL ENTERPRISE CONDUIT DEPLOYMENT SEGMENT 3 PHASE 3 project includes the installation of a multi-user fiber conduit network within public right-of-way and in specific privately owned areas defined in Plan Sheets J.01 and J.02. Division 1 of the project is contained in an area South of Ashworth from I-35 to 28th Street covering the area surrounded by EP True Parkway.. Division 1 work involves installation of City provided vaults and contractor supplying and installing conduit, tracer wire, test stations and other ancillary items required for a complete and functional conduit network for the future installation of fiber optic cables. Division 2 of the project is an area contained within an area West of Jordan Creek Parkway and generally bounded on the North by Ashworth Rd, the South by Bridgewood Blvd . and the East by Wendover Lane . Within Division 2, the contractor will supply and install all vaults, conduit, tracer wire, test stations and other ancillary items required for a complete and functional conduit network for the future installation of fiber optic cables.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents