Similar Projects
Street Enhancements: Plaza Area along NW 16th Street
Infrastructure
Conception
$680,000 est. value
Yukon, OK 73099

Arterial Resurfacing: SW 104th Street from N Morgan Road to S County Line Road
Infrastructure
Conception
$550,000 est. value
Mustang, OK 73064

Intersection Modifications
Infrastructure
Design
$4,537,512 est. value
El Reno, OK 73036

Grade, Drain and Surface - SH 4
Infrastructure
Design
$11,781,436 CJ est. value
Yukon, OK 73099

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Residential Street Resurfacing
Infrastructure
Post-Bid
$6,000,000 est. value
Oklahoma City, OK

Secondary Entry Road and Gate
Infrastructure, Alteration
Results
$685,676 est. value
Mustang, OK 73064

Street Resurfacing/Repair
Infrastructure
Results
$3,848,858 est. value
Oklahoma City, OK

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

Road Reconstruction Ash Road From Piedmont Street To Mustang and Arrowhead Road From Frisco to Cemetery
Infrastructure
Post-Bid
$700,000 CJ est. value
Piedmont, OK 73078

Thin Overlay Resurfacing Unit Price Contract
Infrastructure
Results
$2,150,000 est. value
Oklahoma City, OK

Eagles Glen
New Construction, Infrastructure
Pending Verification
$12,910,000 CJ est. value
Oklahoma City, OK 73099

Starbucks #67956 / Yukon
New Construction, Infrastructure - 2,919 SF
Post-Bid
$700,000 CJ est. value
Yukon, OK 73099

Aviation Records Building Site Improvements Phase II
Infrastructure
Results
$338,266 est. value
Oklahoma City, OK

Last Updated 10/17/2022 06:07 AM
Project Title

Ross Terrace Road Improvements

Physical Address View project details and contacts
City, State (County) Mustang, OK 73064   (Canadian County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bid to include 620 LF of two lane roadway with curb and gutter. This project consists of furnishing all required materials, supplies, equipment, tools, and personnel to perform all necessary labor for the construction of the Ross Terrace Road Improvements. 1. Removal of asphalt and concrete pavement, structures and obstructions, curb(s), and concrete sidewalks. 2. Construct 320 LF of two lane roadway with curb and gutter. Contact Michael Taylor with any questions. Completion- 120 calendar days

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents