Similar Projects
Walnut Street Rectifier and Deep Well Anodes Relocation and Replacement
Infrastructure
Bidding
Ellensburg, WA 98926

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Hanford Integrated Tank Disposition Contract
Alteration
Bidding
WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

New Water Supply Well Five
Infrastructure
Results
$235,000 est. value
Freeland, WA

CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$750,000 est. value
WA

Illinois Well Facility
Infrastructure
Results
$3,025,682 to $3,276,814 est. value
Ellensburg, WA

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Furnish and Install 60HP Input Pump Motor
Infrastructure
Post-Bid
Ridgefield, WA 98642

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Last Updated 12/15/2021 01:22 AM
Project Title

Tacoma Landfill Decommission Gets and Gas Probes

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98421   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $593,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Statement of Work (SOW) pertains to decommissioning of 31 landfill gas monitoring probes, 38 groundwater monitoring wells, 1 landfill gas extraction well (CA-18), and 14 groundwater extraction wells (collectively herein termed installations; 84 total) that were installed to support the final remedy and are no longer required for PCC monitoring activities. Decommissioning of the installations falls under the regulatory authority of Ecology, and associated standards are specified in WAC 173-160, Minimum Standards for Construction and Maintenance of Wells (Minimum Standards).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents