Similar Projects
Design-Build Services for Roadway Improvements to Bay Vista Boulevard from NE 151 Street to Gwen Margolis Boulevard
Infrastructure
Bidding
$6,472,969 est. value
North Miami, FL 33181

Sub-Basin 61 Paving and Drainage Improvements
Infrastructure
Bidding
Palmetto Bay, FL 33157

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Post-Bid
$10,000,000 to $20,000,000 est. value
Miami, FL

Roadway Improvements to NW 97 Avenue from NW 58 Street to NW 70 Street
Post-Bid
Less than $5,405,820 est. value
Miami, FL 33128

Drainage Improvements C-100 Canal Outfalls Retrofit Between SW 98 Ave. and SW 106 Ct.
Results
Less than $693,814 est. value
Miami, FL

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Design-Build Services for Road Improvement to NW 84 Avenue from NW 58 Street to NW 74 Street
Infrastructure
Bidding
$5,924,839 est. value
FL

Drainage Improvements Gladeview Area Phase I-A and Phase II
Post-Bid
Less than $1,140,058 est. value
Miami, FL 33128

Madeleine Village Apartments Seawall Replacement
Results
Less than $530,000 est. value
Miami Beach, FL 33139

NW 90th Street Stormwater Lift Station No. 2 and Retention Area
Renovation, Infrastructure
Bidding
Medley, FL 33166

Improvements to Downtown Mobility
Post-Bid
Less than $1,042,751 est. value
Miami, FL 33129

Sunset Drive Modifications
Results
Less than $350,000 est. value
South Miami, FL 33143

Drainage
Infrastructure
Bidding
$974,359 est. value

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

Drainage Improvements Multiple Sites
Results
Less than $573,862 est. value
Miami, FL 33128

Last Updated 01/27/2022 12:12 AM
Project Title

Resurfacing/Drainage Improvements/Lighting/Traffic Signals

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,143,227
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements under this contract consist of resurfacing along SR A1A/Collins Ave Section 0001 Roadway 0101- 1- Mobilization (43094925201) Ls 1.000 0102- 1- Maintenance of Traffic (43094925201) Ls 1.000 0102- 2-200 Special Detour- Temporary Pavement (43094925201) Ls 1.000 0102- 14- Traffic Control Officer Hr 104.000 0102- 30- Temporary Highway Lighting (43094925201) Ls 1.000 0102- 60- Work Zone Sign Ed 10,700.000 0102- 71- 13 Temporary Barrier, F&i, Low Profile, Concrete Lf 452.000 0102- 71- 23 Temporary Barrier, Relocate, Low Profile Concrete Lf 452.000 0102- 74- 1 Channelizing Device- Types I, Ii, Di, Vp, Drum, or Lcd Ed 20,500.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 900.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 928.000 0102-104- Temporary Signalization and Maintenance, Intersection Ed 900.000 0102-107- 1 Temporary Traffic Detection and Maintenance, Intersection Ed 900.000 0102-115- Type Iii Barricade Ed 2,212.000 0104- 18- Inlet Protection System Ea 11.000 0107- 1- Litter Removal Ac 133.900 0107- 2- Mowing Ac 124.300 0108- 1- Monitor Existing Structures- Inspection and Settlement Monitoring (43094925201) Ls 1.000 0108- 2- Monitor Existing Structures- Vibration Monitoring (43094925201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43094925201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43094925202) Ls 1.000 0110- 2- 2 Selective Clearing and Grubbing, Areas With Trees to Remain Ac 2.400 0110- 4- 10 Removal of Existing Concrete Sy 1,936.000 0110- 21- Tree Protection Barrier Lf 1,543.000 0120- 1- Regular Excavation Cy 4,010.500 0120- 6- Embankment Cy 4,881.300 0145- 2- Geosynthetic Reinforced Foundation Over Soft Soil Sy 3,324.000 0160- 4- Type B Stabilization Sy 13,891.000 0285-703- Optional Base, Base Group 03 Sy 3,322.000 0285-704- Optional Base, Base Group 04 Sy 6,509.000 0285-711- Optional Base, Base Group 11 Sy 5,253.000 0327- 70- 1 Milling Existing Asphalt Pavement, 1" Avg Depth Sy 5,275.000 0327- 70- 5 Milling Existing Asphalt Pavement, 2" Avg Depth Sy 38,600.000 0327- 70- 6 Milling Existing Asphalt Pavement, 1 1/2" Avg Depth Sy 1,681.000 0334- 1- 12 Superpave Asphaltic Conc, Traffic B Tn 548.700 0334- 1- 13 Superpave Asphaltic Conc, Traffic C Tn 3,622.800 0337- 7- 82 Asphalt Concrete Friction Course,traffic C, Fc-9.5, Pg 76- 22 Tn 2,964.300 0339- 1- Miscellaneous Asphalt Pavement Tn 46.600 0425- 1-203 Inlets, Curb, Type 9, J Bot, <10' Ea 1.000 0425- 1-351 Inlets, Curb, Type P-5, <10' Ea 2.000 0425- 1-451 Inlets, Curb, Type J-5, <10' Ea 4.000 0425- 1-452 Inlets, Curb, Type J-5, >10' Ea 3.000 0425- 1-705 Inlets, Gutter, Type S, Partial Ea 1.000 0425- 1-910 Inlets, Closed Flume Ea 1.000 0425- 2- 71 Manholes, J-7, <10' Ea 2.000 0430-175-124 Pipe Culvert,optional Material,round, 24"S/cd Lf 176.000 0430-175-136 Pipe Culvert, Opt Material, Round, 36"S/cd Lf 10.000 0443- 70- 4 French Drain, 24" Lf 104.000 0443- 70- 6 French Drain, 36" Lf 467.000 0443- 72- 21 French Drain- Aggregate Without Pipe, Project 430949-2-52 -01, 1.0-1.9’ Depth Sy 1,668.000 0443- 72- 22 French Drain- Aggregate Without Pipe, Project 430949-2-52 -01, 2.0-2.9’ Depth Sy 764.000 0443- 72- 23 French Drain- Aggregate Without Pipe, Project 430949-2-52- 01, 3.0-3.9’ Depth Sy 156.000 0515- 1- 1 Pipe Handrail - Guiderail, Steel Lf 23.000 0515- 4- 2 Bullet Rail, Double Rail Lf 14.000 0519- 78- Bollards Ea 5.000 0520- 1- 10 Concrete Curb & Gutter, Type F Lf 15,633.000 0520- 2- 4 Concrete Curb, Type D Lf 518.000 0520- 5- 41 Traffic Separator Concrete- Type Iv, 4' Wide Lf 163.000 0521- 72- 42 Shoulder Concrete Barrier, 38" Trench Footing Section Lf 49.000 0522- 1- Concrete Sidewalk and Driveways, 4" Thick Sy 1,348.000 0522- 2- Concrete Sidewalk and Driveways, 6" Thick Sy 1,226.000 0524- 1- 49 Concrete Ditch Pavement, 6", Reinforced Sy 8.000 0526- 1- 2 Pavers, Architectural, Sidewalk Sy 6.000 0527- 2- Detectable Warnings Sf 322.000 0536- 1- 0 Guardrail -roadway, General/low Speed Tl-2 Lf 1,537.000 0536- 1- 1 Guardrail -roadway, General Tl-3 Lf 272.000 0536- 7- 2 Special Guardrail Post- Special Steel Post for Concrete Structure Mount Ea 21.000 0536- 7- 3 Special Guardrail Post- Encased Post for Shallow Mount Ea 2.000 0536- 8-122 Guardrail Transition Connection to Rigid Barrier, F&iindex 536-002, Approach Tl-3 Ea 2.000 0536- 73- Guardrail Removal Lf 941.000 0536- 85- 20 Guardrail End Treatment- Trailing Anchorage Ea 7.000 0536- 85- 24 Guardrail End Treatment- Parallel Approach Terminal Ea 7.000 0550- 10-410 Fencing, Wood Fence, 0.0-5.0' Lf 6,542.000 0550- 60-235 Fence Gate, Type B, Sliding/cantilever, 20.1-24' Opening Ea 1.000 0550- 60-236 Fence Gate, Type B, Sliding/cantilever, 24.1-30' Opening Ea 1.000 0570- 1- 2 Performance Turf, Sod Sy 25,087.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 200.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 3.000 0639- 8- 65 Electrical Power Service- Contribution in Aid of Construction (Ciac), Project 430949-2-52-01 (Do Not Bid) (43094925201) Ls 1.000 0695- 1- 1 Traffic Monitoring Site Vehicle Sensor-non-weight, Furnish & Install Ea 4.000 0695- 6- 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops Ea 4.000 0695- 7-132 Traffic Monitoring Site Cabinet, Furnish & Install, Type 3, Pedestal Mount Ea 1.000 0706- 1- 3 Raised Pavement Marker, Type B Ea 1,142.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 7.768 0710- 11-102 Painted Pavement Markings, Standard, White, Solid for Interchange and Urban Island, 8" Gm 0.217 0710- 11-123 Painted Pavement Markings, Standard, White, Solid for Crosswalk and Roundabout, 12" Lf 1,084.000 0710- 11-124 Painted Pavement Markings, Standard, White, Solid for Diagonal or Chevron, 18" Lf 400.000 0710- 11-125 Painted Pavement Markings, Standard, White, Solid for Stop Line or Crosswalk, 24" Lf 781.000 0710- 11-131 Painted Pavement Markings, Standard, White, Skip, 10-30 Or 3-9 Skip, 6" Wide Gm 2.461 0710- 11-141 Painted Pavement Markings, Standard, White, 2-4 Dotted Guideline/ 6-10 Dotted Extension, 6" Gm 0.532 0710- 11-160 Painted Pavement Markings, Standard, White, Message or Symbol Ea 41.000 0710- 11-170 Painted Pavement Markings, Standard, White, Arrows Ea 55.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 2.621 0710- 11-241 Painted Pavement Markings, Standard, Yellow, 2-4 Dotted Guideline/6-10 Dotted Extension, 6" Gm 0.100 0919-528- 10 Directional Indicators, Project 430949-2-52-01 Sf 153.000 0999- 25- Initial Contingency Amount, Do Not Bid (43094925201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (43094925202) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, F&i Ground Mount, Up to 12 Sf as 120.000 0700- 1- 12 Single Post Sign, F&i Ground Mount, 12-20 Sf as 3.000 0700- 1- 40 Single Post Sign, Install as 19.000 0700- 1- 60 Single Post Sign, Remove as 70.000 0700- 2- 13 Multi- Post Sign, F&i Ground Mount, 21-30 Sf as 1.000 0705- 10- 1 Object Marker, Type 1 Ea 6.000 0706- 1- 3 Raised Pavement Marker, Type B Ea 692.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 269.000 0710- 90- Painted Pavement Markings, Final Surface (43094925201) Ls 1.000 0710- 90- Painted Pavement Markings, Final Surface (43094925202) Ls 1.000 0711- 11-006 Thermoplastic, Standard, Yellow, 3'-9' Skip, 4" for Pedestrian Path, Project 430949-2-52-02 Gm 1.917 0711- 11-102 Thermoplastic, Standard, White, Solid, 8" for Interchange and Urban Island Gm 0.150 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" for Crosswalk And Roundabout Lf 1,151.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" for Diagonals And Chevrons Lf 139.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" for Stop Line And Crosswalk Lf 338.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 0.548 0711- 11-160 Thermoplastic, Standard, White, Message or Symbol Ea 1.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 19.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" for Diagonal Or Chevron Lf 12.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6- 10 Dotted Extension Line, 6" Gm 0.098 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" for Crosswalk Lf 937.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 39.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 37.000 0711- 16-101 Thermoplastic, Standard-other Surfaces, White, Solid, 6" Gm 5.837 0711- 16-131 Thermoplastic, Standard-other Surfaces, White, Skip, 6",10 -30 Skip or 3-9 Lane Drop Gm 2.522 0711- 16-201 Thermoplastic, Standard-other Surfaces, Yellow, Solid, 6" Gm 2.642 0920-714- 28 Green Colored Pavement Markings, Bike Lane, Project 430949-2-52-01 Sf 7,997.000 Section 0003 Lighting 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 12,267.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 96.000 0635- 2- 12 Pull & Splice Box, F&i, 24" X 36" Cover Size Ea 32.000 0635- 3- 12 Junction Box, Furnish & Install, Mounted Ea 1.000 0641- 2- 12 Prestressed Concrete Pole, F&i, Type P-ii Service Pole Ea 2.000 0715- 1- 12 Lighting Conductors, F&i, Insulated, No.8 - 6 Lf 53,517.000 0715- 1- 13 Lighting Conductors, F&i, Insulated, No 4 to No 2 Lf 951.000 0715- 1- 60 Lighting Conductors, Remove & Dispose, Contractor Owns Lf 3,180.000 0715- 4- 11 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 30' Mounting Height Ea 51.000 0715- 4- 70 Light Pole Complete, Remove Pole and Foundation Ea 5.000 0715- 4-824 Light Pole Complete, Furnish & Install Utility Conflict Pole, Index 715-002 Found, 30' Ht, Project 430949-2-52-01 Ea 14.000 0715- 7- 11 Load Center, F&i, Secondary Voltage Ea 2.000 0715- 52- 23 Lighting-special, Standard Pole, Furnish, Double Arm, 30' Mounting Height, Project 430949-2-52-01 Ea 3.000 0715- 52- 24 Lighting-special, Utility Conflict Pole, Furnish, 30' Mounting Height, Project 430949-2-52-01 Ea 2.000 0715- 52- 25 Lighting-special, Turtle Friendly Luminaire, Furnish, Project 430949-2-52-01 Ea 8.000 0715-500- 11 Pole Cable Distribution System, Furnish and Install Alternate System, Conventional Ea 129.000 0715-512-130 Light Pole Complete- Special Design, F&i, Double Arm Shoulder Mount, Aluminum, 30' Ea 32.000 Section 0004 Signalization 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 3,041.000 0632- 7- 1 Signal Cable- New or Reconstructed Intersection, Furnish & Install Pi 3.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 2.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 75.000 0635- 2- 12 Pull & Splice Box, F&i, 24" X 36" Cover Size Ea 3.000 0639- 1-121 Electrical Power Service, F&i, Underground, Meter Furnished by Power Company As 3.000 0639- 1-610 Electrical Power Service, Remove Overhead as 1.000 0639- 1-620 Electrical Power Service, Remove Underground as 1.000 0639- 2- 1 Electrical Service Wire, Furnish & Install Lf 831.000 0639- 2- 6 Electrical Service Wire, Remove Lf 450.000 0641- 2- 12 Prestressed Concrete Pole, F&i, Type P-ii Service Pole Ea 3.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 9.000 0649- 21- 3 Steel Mast Arm Assembly, Furnish and Install, Single Arm 40' Ea 1.000 0649- 21- 6 Steel Mast Arm Assembly, Furnish and Install, Single Arm 50' Ea 1.000 0649- 21- 10 Steel Mast Arm Assembly, Furnish and Install, Single Arm 60' Ea 1.000 0649- 21- 15 Steel Mast Arm Assembly, Furnish and Install, Single Arm 70' Ea 1.000 0649- 21- 21 Steel Mast Arm Assembly, Furnish and Install, Single Arm 78' Ea 2.000 0649- 26- 3 Steel Mast Arm Assembly, Remove, Shallow Foundationbolt on Attachment Ea 3.000 0650- 1- 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 Way As 18.000 0650- 1- 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 Way As 1.000 0650- 1- 18 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Straight, 1 Way As 4.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 10.000 0653- 1- 12 Pedestrian Signal, Furnish & Install Led Countdown, 2 Ways As 1.000 0660- 3- 11 Vehicle Detection System- Microwave, Furnish & Install Cabinet Equipment Ea 3.000 0660- 3- 12 Vehicle Detection System- Microwave, Furnish & Install, Above Ground Equipment Ea 9.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 12.000 0670- 5-140 Traffic Controller Assembly, Furnish & Install Model 207 as 2.000 0670- 5-141 Traffic Controller Assembly, Furnish & Install, Model 2070, 1 Preemption As 1.000 0670- 5-600 Traffic Controller Assembly, Remove Controller With Cabinet As 2.000 0700- 3-201 Sign Panel, Furnish & Install Overhead Mount, Up to 12 Sf Ea 8.000 0700- 3-601 Sign Panel, Remove, Up to 12 Sf Ea 4.000 0700- 5- 21 Internally Illuminated Sign, Furnish & Install Overhead Mount, Up to 12 Sf Ea 9.000 Section 0005 Landscape / Peripheral 0581- 1- 1 Relocate Trees and Palms, Palm, <14' of Clear Trunk Ea 28.000 0581- 1- 2 Relocate Trees and Palms, Palm, >=14' of Clear Trunk Ea 60.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents