Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

HVAC Maintenance Services
Term Contract
Design
Downingtown, Hatboro, Philadelphia, PA

Neshaminy New Maple Point Elementary School - HVAC Construction
Alteration
Bidding
Langhorne, PA 19047

HVAC Equipment and System Maintenance Services IDIQ (NSWCPD)
Term Contract
Bidding
Philadelphia, PA 19112

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

High School North Administration HVAC Replacement
Results
Newtown, PA 18940

Replace Ventilation at Independence Mall Parking Garage
Results
Philadelphia, PA 19106

HVAC/AIR FLOW | Roof Ventilation Installation
Infrastructure
Bidding
Philadelphia, PA

Maintenance, Repair and Inspection Services for Nederman Exhaust Systems
Term Contract
Post-Bid
Philadelphia, PA 19102

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

HVAC/Air Flow | Repair and Upgrade Air Handler RTU3 - PHILA
Term Contract
Bidding
Philadelphia, PA 19104

HVAC & Duct Cleaning and Fiber Lock Sealing
Post-Bid
Philadelphia, PA 19112

Chillers and Hotwater/Glycol Pipeline Replacement at Northeast Water Pollution Control Plant
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19137

Boiler Replacement
Renovation
Post-Bid
Philadelphia, PA 19151

Reported 03/18/2022 12:00 AM
Project Title

Replace Chiller Plants/Cooling Towers

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19106 (Bucks, Philadelphia Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Critical Components - Chillers Number One & Two: This project will remove and replace two centrifugal chillers and their associated controls, pumps, valves, and actuators. Chillers #1 and #2 are 500-ton units installed when the park's central chiller plant was constructed in 1999 and are beyond their useful life. (2) INDE 310912 - Replace Failing Chiller #3 and Cooling Tower #3 at Central Chilled Water Plant: This project will replace one 2005 vintage 500-ton water cooled centrifugal chiller, and one 2005 vintage 500-ton forced draft cooling tower. (3) INDE 310913 - Replace Two Failing Cooling Towers at Central Chilled Water Plant: This project will replace two 1999 vintage 500-ton forced draft cooling towers with two new 750-ton induced draft cooling towers at the Central Chilled Water Plant. It remains essential that the park's central chiller plant remains in continuous operation. Chilled water from the plant must be available year-round to control temperatures and humidity in the park's most critical buildings. Project will be located at Independence National Historical Park, Philadelphia County, Pennsylvania.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents