Reported | 07/07/2022 12:00 AM |
Project Title | Repair CHPP Electrical Panels and Circuits Phase B |
Physical Address | View project details and contacts |
City, State (County) | Eielson AFB, AK (Fairbanks North Star County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Estimated issue date for this solicitation is on or after 25 March 2022, with the solicitation closing approximately 30 days thereafter. It will be issued electronically at the SAM.gov website- https://sam.gov.Eielson Air Force Base has a requirement for a Construction project, FTQW 19-0504 Repair CHPP Electrical Panels and Circuits Phase B. Contractor is to provide all labor, materials, equipment, transportation, and supervision required to complete the following construction project, FTQW 19-0504 Repair CHPP Electrical Panels and Circuits Phase B. The general scope of this project includes upgrading and modifying the low voltage electrical and lighting systems at Eielson’s Central Heat & Power Plant (CH&PP). The Contractor shall provide new light fixtures, conduit, conductors, boxes and appurtenances to replace the light fixtures in the CH&PP, from the 2nd floor to the top of the plant, as well as in the cooling pond pump house. Demolish the existing light fixtures and associated conduit, conductors and appurtenances in the same areas. Provide temporary services and lighting as necessary to maintain CH&PP operations throughout the construction period. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |