Similar Projects
High Expansion Foam Install with Pumphouse
New Construction
Design
$1,000,000 to $5,000,000 est. value
Middle River, MD

MCC Replacement – Green Branch Wastewater and Mill Branch Wastewater Pump Station
Bidding
Laurel, MD

Heritage Harbor 2 Sewage Pumping Station
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Martingham Distribution Pump Replacement
Renovation
Post-Bid
Saint Michaels, MD 21663

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Stony Run Wastewater Pumping Station Upgrade
Results
$2,500,000 to $5,000,000 est. value
Baltimore, MD

Cedar Lane Water Pumping Station
Results
$2,500,000 to $5,000,000 est. value
MD

Heritage Harbor 2 Sewage Pumping Station Upgrades
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Colgate Stormwater Pumping Station Upgrade
Results
$2,000,000 to $3,000,000 est. value
Baltimore, MD

Construction of Newark Spray Irrigation Facilities
Results
Snow Hill, MD 21863

Smouses Mill Pumping Station Upgrades
Results
$125,000 est. value
Cumberland, MD 21502

Refurbishment of Little Anacostia Wastewater Pumping Station
Renovation
Results
$5,000,000 to $7,000,000 est. value
Capitol Heights, MD 20781

Daniels Area Wastewater Pump Station
Results
Less than $1,505,000 est. value
Columbia, MD 21046

Hyde Park Pumping Station Improvements—Consent Decree
Results
$2,500,001 to $5,000,000 est. value
Hydes, MD 21221

Cockeysville Pumping Station Improvements
Renovation
Results
$5,000,001 to $10,000,000 est. value
Cockeysville, MD 21030

Reported 06/04/2020 08:37 AM
Project Title

Potomac WP Chlorine Scrubber Replacement

Physical Address View project details and contacts
City, State (County) Potomac, MD 20854   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, materials, equipment and services necessary for and incidental to the construction of the new chlorine gas scrubber system and demolition of the existing chlorine gas scrubber system, complete in place including protection and maintenance of existing structures, facilities and utilities and restoration of disturbed or damaged property, all as specified herein or shown on the Contract Drawings. Refer to the Appendix A for the OSDI Participation Requirements.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Common Work Results for Existing Conditions, Geosynthetics for Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete.
Division 05 - Metals, Metal Support Assemblies, Mechanical Metal Supports, Metal Fabrications.
Division 09 - Finishes, Painting.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Water Utility Distribution Piping, Fire Suppression Utility Water Distribution Piping.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Gas and Liquid Purification Process Equipment, Chlorination Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents