Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 est. value
Orange, CA 92869

Modify Existing Traffic Signals for Improved Visibility, Add Safety Lighting, Refresh Pavement Delineation
Infrastructure
Design
$2,140,000 est. value
Santa Ana, CA 92799

Reconstruct Curb Ramps and Cold Plane Pavement With RHMA
Infrastructure
Bidding
$11,500,000 est. value
Laguna Beach, CA 92652

Bake Parkway at Baffin Bay Median Improvement Project
Infrastructure
Bidding
$50,000 est. value
Lake Forest, CA 92630

Arterial Sidewalk Removal and Replacement at Various Locations Phase Six
Infrastructure
Post-Bid
$350,000 est. value
Anaheim, CA

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

Annual Sidewalk And Curb Access Ramp Improvements
Alteration
Results
$290,000 est. value
La Habra, CA 90632

Turtle Rock Community Park Parking Lot Rehabilitation
Infrastructure
Results
$680,000 est. value
Irvine, CA 92606

Santiago Canyon College Barrier Removal Lot 2 & 7 Crosswalks
Infrastructure
Bidding
$320,000 to $360,000 est. value
Orange, CA 92869

Glen Mar Frontage Road Beautification Project
Infrastructure
Post-Bid
Huntington Beach, CA 92646

On Call Sewer Lateral Installation & Curb Gutter, Sidewalk Removal and Replacement
Term Contract, Infrastructure
Results
Huntington Beach, CA 92468

Flower Street Bike Trail Renovation From Crossover to Warner Avenue
Infrastructure, Alteration
Bidding
$659,000 est. value
Santa Ana, CA 92799

Striping Modification of Existing Crosswalk
Infrastructure
Post-Bid
$169,024 est. value
CA

Reported 06/24/2022 01:31 PM
Project Title

Bristol Street (Bear Street to Santa Ana Avenue) Bicycle Facility - City of Costa Mesa

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $525,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Costa Mesa, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. Bristol Street (Bear Street to Santa Ana Avenue) Bicycle Facility A detailed Scope has not yet been Determined. As of June 23, 2022, this project is currently in the FY 2022-2026 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents