Similar Projects
Reconstruction of Clearview Pumping Station
Renovation
Bidding
$21,492,605 to $29,078,230 est. value
Flushing, NY

WPCP and Pine Street Pump Station Rehabilitation
Renovation
Bidding
Poughkeepsie, NY 12601

Reconstruction of 108th Street Pumping Station
Post-Bid
$31,705,000 to $42,895,000 est. value
NY

Wet Well Stair Replacement at Pump Stations 1E and 2E
Post-Bid
Rushville, NY

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

Belleayre Upper Mountain Snowmaking Pump Station - G, H, P, SP and E
Results
$3,370,000 to $3,855,000 est. value
Highmount, NY 12441

Bay Park Conveyance
Term Contract
Construction
Less than $439,000,000 est. value
NY

Sanitary Wastewater Pump Station Upgrades General Construction
Renovation
Construction
Saratoga Springs, NY

Browns Pond Pump Station Permanent Generator
New Construction
Bidding
Newburgh, NY

Bay Village Pump Station Replacement (REDI MO.64)
Post-Bid
Rochester, NY 14617

Trunk Sewer Main and Pump Station Reconstruction
Results
Less than $4,700,000 est. value
Peru, NY 12972

I-481 and S.R. Industrial Sewer Corridor Project
New Construction
Construction
DeWitt, NY 13057

Sewer Phase 2B - Sanitary Sewer Pump Station Rehabilitation
Renovation
Bidding
Lockport, NY

UV Upgrades at Rye Lake Pump Station-General Construction
Post-Bid
Mamaroneck, NY

Tuckahoe Road Chlorine Booster Station Upgrades
Results
Yonkers, NY 10701

Reported 03/29/2022 11:35 AM
Project Title

Pump Station 11 Replacement Project

Physical Address View project details and contacts
City, State (County) Victor, NY 14564   (Ontario County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: The project consists principally of the replacement of an existing pump station with a new suction lift pump station, abandonment of the existing wet well and removal of the existing pump station. The project also includes the installation of approximately 20 linear feet of 8-inch force main, 40 linear feet of 18-inch gravity sewers, and other appurtenances. Alternative 1: This portion consist of replacing the existing generator at the pump station.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents