Similar Projects
Construction of 170 South Well House
Infrastructure
Bidding
Millville, UT

Crockett Well Reconstruction
Term Contract
Bidding
Logan, UT

Construction of the Coldwater Well Improvement Project
Post-Bid
Mendon, UT 84325

Ras Pump System
Post-Bid
Provo, UT 84601

Water System Drilling, Construction and Testing
Results
Heber, UT

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Murray Park Well
Results
Less than $1,257,651 est. value
Murray, UT 84107

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Municipal Water Wellhouse
Results
West Bountiful, UT 84087

Water Treatment- Green Well
Post-Bid
Riverton, UT

Sewer Grinder
Results
Roy, UT 84067

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Scipio Town Well Improvements
Post-Bid
Scipio, UT

Last Updated 07/16/2021 09:50 AM
Project Title

Drinking Water Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Orem, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase an electric motor, column, submersible pump and appurtenances to rehabilitate a drinking water well. The proposal shall include a cost for the following: 1. New 125 HP, 1800 RPM submersible Hitachi electric motor 3/60/460 Volt or equivalent 2. New National Submersible Pump Assembly capable of producing 600 GPM at 620’ total dynamic head (cast iron bronze fitted construction). 3. 540’ of new 6” threaded domestic steel column pipe with couplings. 4. 575’ of 4/0 three wire with ground (flat jacketed submersible cable) 5. Provide cost for new check valves. 6. 560’ of 2” PVC sounder tube 7. Replace 6” threaded steel nipple below discharge elbow 8. Installation and successful startup of all water well equipment. 9. Supply all equipment operating and maintenance manuals.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents