Similar Projects
Construction Management Services
Post-Bid
IL

Capacity, Management, Operations, and Maintenance Plan (CMOM)
Term Contract
Post-Bid
Rock Island, IL 61201

Golf Course Management
Term Contract, Infrastructure
Post-Bid
Danville, IL

JCK IRS Consolidation - CMc Services
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Chicago, IL 60604

Professional Consultation Services for the Privatization of Potable Water and Sanitary Treatment Systems
Term Contract
Post-Bid
Rock Island, IL

Last Updated 09/15/2021 06:33 AM
Project Title

Thornton Transitional Reservoir CSA Decommissioning

Physical Address View project details and contacts
City, State (County) Thornton, IL   (Cook County)
Category(s) Professional Services
Sub-Category(s) Commissioning
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,981,000 to $25,398,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of concrete tunnel plugs; installation of mass concrete fill; tunnel lining and contact grouting in the Diversion Tunnel from approximately Station; removal of the rock plug in the upper Thorn Creek Connection Tunnel; tunnel lining and contact grouting; and removal of concrete and metal components, loose rock, sediment, and vegetation at the Thornton Transitional Reservoir, removal of the existing concrete haul tunnel plug. Work also includes demolition inside the cone valve dewatering chamber, including the removal of four (4) 42” diameter knife gate valves, two (2) 42” cone valves and spool pieces, and the hydraulic power unit and its appurtenances, along with removal of all conduits, cables and other live utilities from the control to the valve chamber; sealing a 42” dewatering pipe with a DIP blind flange and replacing a cone valve with a 42” DIP pipe; The Dewatering Chamber and Valve Shaft shall be sealed shut at the access point in the control building; installation of backflow preventer on the 42” dewatering outlet pipe inside the Construction Shaft; removal of two (2) electrical cabinets along Vincennes Road; removal of existing swing gate at northwest corner of the Thornton Composite Reservoir (TCR) and replacement with new chain link fencing and posts; Repairs to rockfall netting at approximately nine (9) locations along the TCR north highwall access ramp; Removal of rock and sediment debris at the bubbler intake adjacent to toe of TCR north highwall; Installation of reservoir level measurement equipment at the TCR; Work at the 30-ft diameter TCR Construction Shaft includes concrete liner repairs.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents