Similar Projects
New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

The Bridge Flats
New Construction, Infrastructure - 18,000 SF
Design
$13,000,000 CJ est. value
Bellevue, NE 68005

RFP - Sewer Rate Study
Term Contract
Bidding
La Vista, NE 68128

Lakewood West Storm Sewer and Paving Sections 1 and 2
Infrastructure
Bidding
$5,800,000 CJ est. value
Bellevue, NE 68005

RFQ D/B - NKO Campus, NKO Facility and Courier Station
New Construction, Infrastructure - 430,000 SF
Post-Bid
$500,000,000 CJ est. value
Offutt AFB, NE 68113

RFQ D/B - NKO Campus, NKO Facility and Courier Station
New Construction, Infrastructure - 430,000 SF
Post-Bid
$500,000,000 CJ est. value
Offutt AFB, NE 68113

Aspen Creek North - Phase 2 Water Main Improvements
Infrastructure
Results
Gretna, NE

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Cardinal Commons I
New Construction, Infrastructure
Design
$13,000,000 CJ est. value
Highland II, NE 68147

Highland Trails Water Main Improvements
Infrastructure
Bidding
$3,310,000 CJ est. value
Gretna, NE 68028

66th & Cedardale Sidewalk Improvements
Infrastructure
Post-Bid
Papillion, NE 68046

Concrete Pavement-N-50 / Platteview Road, Springfield
Infrastructure
Results
NE

Last Updated 12/29/2022 05:05 PM
Project Title

RFP D/B - OSS/SERE Ops Facility

Physical Address View project details and contacts
City, State (County) Offutt AFB, NE 68113   (Sarpy County)
Category(s) Commercial, Education, Heavy and Highway, Industrial/Manufacturing, Sewer and Water
Sub-Category(s) Car Wash, Industrial Warehouse, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vocational School, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $37,158,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Dec 23, 2022 Contract Award Number: W9128F23C0006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: MEDVOLT - TEPA EC JV Contractor Awarded Address: Colorado Springs, CO 80919 USA Base and All Options Value (Total Contract Value): $37158000.00 The offeror hereby agrees to do all w ork described in the documents entitled: OSS AFE/SERE OPS Facility SGBP212903 (FY20) Offutt Air Force Base, NE RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00 AND SECTION 00 45 00. THIS SOLICITATION IS RESTRICTED 100% TO SMALL BUSINESS INTEREST. The magnitude of the construction cost for this project is between $25,000,000 and $100,000,000. Bidders shall submit all questions via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/, ten calendar days before bid opening, to allow the government time to respond before receipt of bids or issue an amendment. Bidders must use the Bidder Inquiry Key and instructions below to submit and review inquiry items. A bidder who enters a comment/question will receive an acknowledgment of their comment /question by email, followed by an answer to the comment/question after the government has processed it. The government will make available all timely questions and approved answers in ProjNet. The Solicitation Number is: W9128F22R0047 Project Name: Offutt Flood Recovery - OSS AFE/SERE Ops Facility The Bidder Inquiry Key is: 6PX56W-W272P7 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

1 Story Above Grade, 50,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents