Similar Projects
Finkbine Street and Parking Lot 5 Paving Replacement
Infrastructure
Bidding
$200,000 est. value
Des Moines, IA 50319

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Bidding
$10,000,000 to $25,000,000 est. value

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

HMA Joint and Crack Sealing
Infrastructure
Bidding
$80,000 to $125,000 est. value
Altoona, IA 50009

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

2022 Newport Vista Storm Sewer and Trail Improvements
Infrastructure
Bidding
$500,000 est. value
Johnston, IA

Sidewalk and Crossing Guard Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

HMA Resurfacing with Milling - I 80
Infrastructure
Bidding
$125,000 to $250,000 est. value
Altoona, IA 50009

Camp Dodge Truck Entrance Road Rehab and Replacement
Renovation, Infrastructure
Post-Bid
Johnston, IA 50131

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

Reported 06/01/2022 12:00 AM
Project Title

Rock Creek Greenway Trail Improvements

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50023   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $125,300 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes all materials, equipment, transportation, labor and coordination needed to complete the work associated with constructing a PCC trail at Rock Creek Greenway in Ankeny, IA. Improvements include demolition, grading and storm sewer pipe install, PCC trail, surface restoration, and miscellaneous associated work necessary to complete the project. Near the intersection of NW Season Drive and W Fifth Street in northwest Ankeny.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents