Similar Projects
Franklin O and M Facility Geothermal Systems Modifications
Alteration
Bidding
Minneapolis, MN

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

HVAC and Mechanical Products
Term Contract
Post-Bid

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Madison Elementary School HVAC Replacement and Deferred Maintenance - Phase 2
Results
Blaine, Minneapolis, MN 55434

Maintenance and Repair for Chillers at Anoka Metro Regional Treatment Center
Term Contract
Post-Bid
$15,000 to $20,000 est. value
Anoka, MN 55303

Monroe Elementary School HVAC Replacement and Deferred Maintenance - Phase 3
Results
Anoka, MN

2021 Concourse B Heating Upgrades P1
Renovation
Post-Bid
Minneapolis, MN

Hamilton Elementary School HVAC Replacement and Deferred Maintenance - Phase 1
Results
Coon Rapids, MN 55433

2021 Westwood Middle School Chiller Replacement
Alteration
Post-Bid
Blaine, MN 55434

2021 HVAC Unit Replacements at Savannah Oaks
Term Contract
Results
Ramsey, MN 55303

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Braemar Ice Arena Dehumidification Upgrade
Renovation
Results
$240,000 est. value
Edina, Minneapolis, MN

HVAC Systems and Related Services
Alteration
Post-Bid

Boiler Burner Replacement and Cooling Tower Recondition
Results
$300,000 est. value
Anoka, MN 55303

Last Updated 10/15/2021 03:51 PM
Project Title

Coon Rapids - East Water Treatment Plant HVAC Improvements

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55448   (Anoka County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal existing air handling unit (AHU-211) and condensing unit serving the Control Room. Provide new rooftop air handling unit to serve control room. Remove existing boilers. Remove existing hydronic system pumps. Remove existing air handling unit (AHU-213) serving the boiler room. Remove hydronic balancing valves and drain valves throughout the plant. Provide new rooftop air handling unit to serve the Control Room. Provide new condensing boilers and accessories including concrete pad and breeching. Provide new boiler pumps. Provide new hydronic system pumps. Provide variable frequency drives for hydronic system pumps. Provide new variable speed fan to serve boiler room. Provide new basement exhaust fan. Provide new fluoride room exhaust fan and dampers. Provide new barometric room dampers and controls. Provide new balancing valves and drain valves throughout the plant. Retrofit existing hydronic system with glycol to prevent freezing. Provide new controls for HVAC equipment including air handling units, rooftop units, fans, pumps, and boilers. Flush and clean hydronic hot water system and provide chemical anti-corrosion agents and 35% glycol solution. Pressure test and inspect hydronic system prior to start up.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents