Similar Projects
Padmount Switchgear
Bidding
Farmington, NM 87401

Hot Line Maintenance
Post-Bid
Farmington, NM

Water Treatment Plant Emergency Generator
Post-Bid
Bloomfield, NM

Electrical Connectors
Term Contract
Results
Farmington, NM

San Juan County McGee Park Coliseum and Site Electrical Upgrades-Phase 3
Results
Farmington, NM

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Switches, Disconnects, Reclosers and Sectiontionalizer, and Padmount Switchgear
Results
Farmington, NM

Substation Batteries and Installation
Post-Bid
Aztec, NM 87410

Wood Distribution Poles
Results
Farmington, NM

Solar Paneled Carports
Post-Bid
Farmington, NM

115KV Upgrade Hare to Dwight Arthur Substation
Results
Farmington, NM

N--NIIP Block 4, 6 & 7 Power Factor Correct
Post-Bid
$1,000,000 to $5,000,000 est. value
NM

Generator Step-Up Transformer for Bluffview
Results
Farmington, NM 87401

BIE/NMNN/FACMGT/3-Generators
Post-Bid
Fruitland, NM 87416

1000 KVA 3 Ph Padmount Distribution Transformer
Results
Aztec, NM

Reported 04/27/2019 12:00 AM
Project Title

NIIP Block 4, 6 and 7 Power Factor Corrections

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work is located approximately ten miles south of Farmington, New Mexico, in San Juan County. The work at the pumping plants shall consist of furnishing and installing the following: 1. Provide and install power factor correction capacitors along with insulated power conductors, terminal connectors, power terminal blocks and other materials required to connect the power factor correction capacitors to the motor controllers at pumping plants listed in Article 3.02 Schedules, of Division 26 35 33, Tables 26 35 33A – Power Factor Capacitor Size. 2. Concrete pads for mounting power factor correction capacitors on the outside wall at pumping plants shown in tables 26 35 33A.
Details
Division 26 - Electrical.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents