Similar Projects
Medical District Drainage Tunnel Extension at Ehrhardt Street
Bidding
$10,000,000 est. value
Charleston, SC 29425

Taylor Street Railroad Drainage Repair
Infrastructure
Bidding
SC

District 2 On-Call Pipe Repair
Post-Bid

District 2 On-Call Pipe Repair
Post-Bid

Rosa Lane Drainage Improvement Project
Results
Greenville, SC 29601

FY20 Clouter Creek North Cell Ditching
Results
$500,000 to $1,000,000 est. value
Charleston, SC 29403

Shoreline Stabilization-Lake Greenwood State Park
Infrastructure
Bidding
$200,000 to $225,000 est. value
Ninety Six, SC 29666

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

Precast Reinforced Concrete Floorless Culvert-Arch Box Type
Results
Pickens, SC 29671

Road Work - Pinckney Street Drainage Project TST
Infrastructure
Bidding
Charleston, SC 29401

Huger Street and King Street Intersection Drainage Improvements Project
Post-Bid
Charleston, SC

Installation of Drainage System in Playground Area
Results
Florence, SC 29063

Road Work - Scotia Street Drainage CTC
Infrastructure
Bidding
McClellanville, SC 29458

Campus Village Residential Development - South Tunnel Stabilization
Post-Bid
$600,000 to $800,000 est. value
Columbia, SC 29208

MBWWTP Tank Drainage Rehabilitation Submersible Pumps
Results
Myrtle Beach, SC 29579

Last Updated 12/17/2021 03:31 PM
Project Title

Spaulding Heights Drainage Project

Physical Address View project details and contacts
City, State (County) SC   (Florence County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Spaulding Heights Park Drainage Project includes the demolition and removal of existing storm drainage piping, drainage structures, fencing, existing asphalt walking path, existing asphalt basketball court and replacement with approximately 156 linear feet of new 18” RCP, 96 linear feet of new 30” RCP, 204 linear feet of new 36” RCP , 1 new precast drop inlet, 2 new precast junction box/manholes, 1 new precast concrete headwall on 30” RCP and 1 new precast 36” flared end section. The work includes restoration of the asphalt pathway, fencing removed to facilitate construction and restoration of the asphalt basketball court to new location and dimensions., within the limits of work of the drainage piping replacement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents