Similar Projects
Last Updated | 04/15/2022 07:53 AM |
Project Title | Lift Station M-16 Replacement |
Physical Address | View project details and contacts |
City, State (County) | FL (Brevard County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,668,550 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the replacement of Lift Station M-16 and construction of 720 LF 12” HDPE on-grade direct bore located in Merritt Island, including conversion of the existing wet well into a manhole; installation of a new 12’ diameter pump station to support two-12 horsepower submersible pumps and generator; installation of 10” force main from discharge valves to proposed 16” force main; manhole construction, manhole rehabilitation, manhole removal; abandonment/removal of existing force main and gravity sewer; construction of bypass assembly; repair of disturbed roadway; installation, maintenance, and removal of the temporary bypass to facilitate the lift station modifications; and all other incidentals necessary to complete the work. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |