Last Updated | 04/18/2023 01:35 AM |
Project Title | Lakeside Valve Station Replacement |
Physical Address | View project details and contacts |
City, State (County) | Lakeside, CA 92040 (San Diego County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,215,017 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes the replacement of an existing water valve station on an approximately 0.68-acre lot at 12450 Woodside Avenue with a new valve station. Removal of the existing valve station would consist of the demolition of five existing one-story accessory structures (garage, out building, caretakers house, pumping plant, and valve station) and existing asphalt concrete paving, concrete pad, and sidewalk; removal of existing landscaping and approximately five street trees, and removal of existing water pipe, valves and appurtenances. The new valve station would consist of a new 5,800 square-foot, one story structure, which would house an electrical room, mechanical room, and valves. The new adjacent workroom is approximately 760 square feet in area. The project would also include installation of underground water utilities, valves, and other water-related appurtenances, asphalt and concrete paving, sidewalks, landscaping and street trees, and a new valve station garage. In addition, the project will construct a backup generator which includes a permanent diesel-fueled generator on site for up to a 36-hour duration of emergency power generation. Note from Shimmick Construction: Please note there is a form REQUIRED from ALL Subcontractors, Suppliers and Manufacturers due by COB April 3rd. Please see Folder 5 . REQUIRED Forms for a copy. Please also note there is a form REQUIRED from ALL DBE/SBE's due by COB April 3rd. Please see Folder 5 . REQUIRED Forms for a copy. The City's estimated construction cost for this project is $38,400,000. Any questions related to this solicitation shall be submitted to: JEEspindola@sandiego.gov Questions received less than 14 days prior to the date for opening of Bids may not be considered Project Duration- 430 Working Days Addendum A-B have been issued as of 3-21-2023. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | 5,800 SF.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |