Similar Projects
Holiday Park Storm Sewer - Phase 1
Post-Bid
Plum, PA

Construction of Storm Water Management Facilities
Post-Bid
Plymouth, PA 18651

Dunn Avenue Storm Sewer Repairs
Results
Washington, PA 15301

Harford Road Mulch Trail and Stormwater Pipe and Structures
Results
Wayne, PA 19087

Ridgeview/Lakeview Drive Stormwater Retrofit
Renovation - 38,100 SF
Construction
Lake Ariel, PA 18436

Relief Storm Sewer Project
Post-Bid
Erie, PA 16501

North Main Street Stormsewer Diversion Project
Results
Less than $113,846 est. value
Chambersburg, PA 17201

Storm Sewer Rehabilitation Project
Post-Bid
Cheswick, PA 15024

Storm Water Improvements - Thompson and Walnut Streets
Results
Curwensville, PA 16833

Capital Improvement Project Chestnut Ridge Cured-In-Place Pipe Lining
Post-Bid
State College, PA 16801

Construction of Green Stormwater Infrastructure in Wolf Street From 6th Street to 5th Street
Results
$1,000,000 to $2,000,000 est. value
Philadelphia, PA 19135

Storm Inlets and Grates
Post-Bid
North Huntingdon, PA 15642

Storm Drain Relocation at the High School
Results
Hummelstown, PA 17036

Lucerne Avenue Storm Sewer Replacement
Post-Bid
McKnight, PA 15237

Colonial Avenue Storm Sewer Replacement
Results
Erie, PA 16506

Last Updated 11/29/2021 04:28 PM
Project Title

Installation of Storm Water Improvements along Welsh Road (T-333)

Physical Address View project details and contacts
City, State (County) Sugarloaf, PA 18249   (Luzerne County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal of (9) nine existing corrugated metal storm water pipes (18 inch diameter) being approximately 40 foot in length, the installation in the same locations and depth of (9) replacement HDPE pipes being of equal diameter and length along Welsh Road (T-333), except as those shown on the plans. Also, the installation of (1) one new HDPE storm pipe being 24 inch in diameter and 40 foot in length at approximately Road Station 14+17 at proper depth to provide drainage and cover to cross roadway and at the proper angle as shown on the plans. All new storm water cross pipes will have stackable stone Headwalls and endwalls as shown on the attached specifications. Additionally, R-4 Rip-Rap will be placed at the outlet end of all new pipes with a total maximum amount to be placed of 44 cubic yards. Approximately 1,300 lineal feet of ditch line shall be regraded, seeded, and mulched as shown on the plans, Installation of approximately 345 lineal feet of 6 inch perforated HDPE installed as shown on the plans.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents