Similar Projects
Potable Water Tank #1 Improvement
Infrastructure
Bidding
Durango, CO 81303

Middle Water Storage Tank Foundation Stabilization
Post-Bid
Less than $200,000 est. value
Clifton, CO 81520

Moraine Park Campground and HQ Utilities
Post-Bid
Grand Lake, CO

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Tank Cleaning and Inspection
Post-Bid
Canon City, CO

Traer Creek Tank Replacement
Results
Less than $9,812,000 est. value
Vail, CO 81657

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Cardiff Water Storage Tank Project
Results
Glenwood Springs, CO

Prequalification: Price Park Tank Replacement
Post-Bid
Longmont, CO

Rehabilitation of Two 2-MG Drinking Water Storage Tanks
Results
$800,000 to $1,000,000 est. value
Cortez, CO

On Call Tank and Monitoring Services
Post-Bid
CO

Y--Zion-New Water System at Kolob Canyons
Results
$1,000,000 to $5,000,000 est. value
Denver, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Griswold Water Purification Facility Surge Tank Improvement
Results
$2,717,000 to $3,222,000 est. value
Aurora, CO

Reported 04/06/2022 12:00 AM
Project Title

Madera Wildlife Water Catchment

Physical Address View project details and contacts
City, State (County) Denver, CO 80238   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Land Management-Socorro Field Office (BLM-SFO) is planning to construct 1,000 sq-ft metal catchment. Catchment will be constructed of pipe and purlins, with a propanel top. The water catchment is composed of two 20’ X 25’ structures which slope inward and drain into a 6” galvanized gutter. The contractor shall complete tasks described under section A.4.0 as SPECIFIC TASKS and abide by items described under section A.6.0 and A.7.0. The contractor shall ensure that all equipment, tools, supervision, and other items and services are provided to perform required tasks, except as specified in section C-3 as

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents