Similar Projects
2022 Lead Service Line Replacements
Infrastructure
Bidding
$1,000,000 est. value
Inkster, MI

Avondale Road Reconstruction Phase 2 - Water Main Improvements
Infrastructure
Bidding
$600,000 est. value
Inkster, MI 48141

Annex Building Water Main and Fire Supression
Post-Bid
Detroit, MI

Sewer System Rehabilitation Project
Post-Bid
River Rouge, MI

2020 Tap and water Repair Contract
Results
Ecorse, MI 48229

Garland, Hurlbut, Bewick Water Transmission System Rehabilitation (NE Transmission Phase 3)
Results
Detroit, MI

North River Park Water Main Improvements
Infrastructure
Bidding
$200,000 est. value
Inkster, MI 48141

CDBG Sewer Cleaning
Post-Bid
Taylor, MI

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

Section 17 Water Main Improvements
Infrastructure
Bidding
$200,000 est. value
Detroit, Flint, Inkster, MI 48269

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

2019 Brownstown Water and Sewer Improvements
Results
Less than $2,000,000 est. value
Brownstown, MI

Water Meter Replacement Program
Infrastructure
Post-Bid
Ecorse, MI

2020 Water Main Replacement Multiple Locations
Results
Grosse Ile, MI 48138

Annual "On Call" As Needed Lateral Sanitary Sewer Tap Repair
Term Contract
Post-Bid
Dearborn Heights, MI

Last Updated 06/15/2022 04:06 PM
Project Title

Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority

Physical Address View project details and contacts
City, State (County) Detroit, MI 48209   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value Less than $35,607,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a water / sewer project in Detroit, Michigan. Conceptual plans call for the renovation of a water / sewer project. This project will include the study, design, and construction for the needed improvements to the SFE pump station. This includes required capacity, pumps, strainers, piping, controls, building improvements, and electrical supply. This will also include a study to evaluate the potential for replacing the secondary water utilization with SFE utilization where feasible and an alternative analysis to the existing carrier water at chlorination/dechlorination facility, seal water, recovery needs which may include additional SFE treatment such as chemical addition to accommodate process needs. As of June 14, 2022, this project is included in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents