Similar Projects
Central Storage Facility RTU Removal
Alteration
Bidding
$24,500 est. value
Dubuque, IA 52001

Periodic Maintenance Inspection on Boilers
Term Contract
Bidding
Davenport, IA 52801

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Bettendorf High School – Dust Collector Replacement
Alteration
Results
Bettendorf, IA 52722

Aquatic Center HVAC Replacement
Alteration
Results
North Liberty, IA 52317

Southwest Valley High School Boiler and Gym Equipment Pre Purchase
Alteration
Bidding
$250,000 est. value
Corning, IA 50841

Chiller Replace - Roundy Elementary School
Alteration
Post-Bid
Columbus Junction, IA 52738

Ridgeway Towers Boiler Replacement
Alteration
Results
Waterloo, IA 50701

Solon Community School District AHU Improvements
Alteration
Bidding
$250,000 est. value
Solon, IA

Replacement of 126 Water Heaters
Alteration
Post-Bid
Corning, Creston, Lamoni, Lenox, Leon, Mount Ayr, Osceola, IA

Removal and Replacement of Two Air Supply Units
Alteration
Results
$250,000 est. value
Davenport, IA 52801

Replacement of Dust Collection and Roofing Systems
Alteration
Bidding
$385,000 est. value
Cedar Rapids, IA 52402

University of Northern Iowa ITC - Request for Qualifications For Mechanical & Electrical Contractors
Renovation, Addition, Alteration - 87,197 SF
Post-Bid
Cedar Falls, IA

Story County Justice Center HVAC Equipment Replacement Phase 2 and 3
Alteration
Results
Nevada, IA 50201

Last Updated 04/20/2022 02:00 PM
Project Title

Law Enforcement Center Rooftop Mechanical Replacement

Physical Address View project details and contacts
City, State (County) Algona, IA 50511   (Kossuth County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove & replace existing rooftop mechanical air handling unit serving the building. Ne direct digital controls (DDC) will be installed throughout the building for the new equipment and the replacement for the existing pneumatic controls on equipment to remain. Electrical work consists of disconnection of equipment to be removed, power to new equipment and removal and reinstallation of incidental devices to allow for the new mechanical installation. Roof membrane protection, modification and repair will be incidental.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents