Similar Projects
Reported | 01/25/2022 12:00 AM |
Project Title | Boiler Replacement - Harold Martin School |
Physical Address | View project details and contacts |
City, State (County) | Hopkinton, NH 03229 (Merrimack County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove Weil McLane Model #688 1180 MHB boiler and oil burner Furnish and install new boiler and oil burner of like size and kind (oil and or propane option) Furnish and install new pump(s) as required Disconnect and reconnect hot water supply and return piping Furnish and install new piping as needed Disconnect and reconnect existing oil lines to burner Disconnect and reconnect existing flue piping, replace as required Furnish new boiler controls and safeties, to be installed by others Furnish and install new air separator Provide insulation subcontractor for insulation of new piping if required. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |