Similar Projects
Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Mount Diablo Boulevard Multi-Use Development
New Construction, Infrastructure - 4,300 SF
Design
$10,000,000 CJ est. value
Lafayette, CA 94549

Arlington Park Improvements Project
Infrastructure
Bidding
$285,000 CJ est. value
El Cerrito, CA 94530

Danville Sewer Renovations, Phase 4
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Danville, CA 94526

Portside Commerce Center / Richmond
Demolition, New Construction, Infrastructure - 282,650 SF
Post-Bid
$108,688,800 CJ est. value
Richmond, CA 94804

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Miner Road and Bear Creek Road Bridges Seismic Retrofit Project
Infrastructure
Results
$1,425,214 CJ est. value
Orinda, CA 94563

Hilton Garden Inn / Walnut Creek
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Walnut Creek, CA 94596

Alves Lane Apartments
New Construction, Infrastructure - 125,350 SF
Construction
$40,000,000 CJ est. value
Bay Point, CA 94565

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

River Pumping Station Rehabilitation - 7690 - City of Antioch
Renovation, Infrastructure
Conception
$1,100,000 CJ est. value
Antioch, CA 94509

AutoZone #3343 / Pittsburg
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Pittsburg, CA 94565

Last Updated 09/07/2023 12:13 AM
Project Title

Mercedes Benz Renovation/ Walnut Creek

Physical Address View project details and contacts
City, State (County) Walnut Creek, CA 94596   (Contra Costa County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Mercedes Benz of Walnut Creek 1301 Parkside Drive Walnut Creek, CA 94596 September 18, 2023 at 2pm This is a OPEN STORE remodel of existing Mercedes-Benz dealership. Construction to start 1/15/2024. Refer to milestone documents. Final Cleaning: Refer to plan. Temp Facility: Provide cost for 14 months duration. Concrete: Refer to structural plan for footings. Carpentry: Refer to structural plan for shear walls. Insulation: Refer to plan. DFH: Refer to plan. Overhead Coiling Grilles: Refer to plan. Metal Stud Gypsum Wall Bd: Refer to plan. Include separate pricing for plywood sheathing. Acoustical Ceiling: Refer to plan. Tile: Refer to plan. Floor Covering: Including all base. Painting: Refer to plan. Fire Extinguishers: Refer to plan. Fire Protection: Include plan and plan check and permit fee. HVAC: Refer to mechanical plan. Electrical: Include fixture package. Construction is expected to start January 2024. Completion is expected August 2024.

Details

2 Stories Above Grade, 51,598 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents