Similar Projects
Leak Detection Services
Infrastructure
Bidding
North Wales, PA 19454

Water Piping and Fittings
Results
Pottstown, PA 19464

Water Distribution Materials - Brass
Results
North Wales, PA 19454

Water Distribution Materials - Ductile Iron Pipe Contract
Term Contract
Results
North Wales, PA 19454

Water Distribution Materials- Ductile Iron Fittings Contract
Term Contract
Results
North Wales, PA 19454

Water Distribution Materials - Curb Boxes
Term Contract
Results
North Wales, PA 19454

Water Distribution Materials - Retaining Gland Packs
Results
North Wales, PA 19454

Water Distribution Materials - Stainless Steel Repair Clamps and Tapping Sleeves
Results
North Wales, PA 19454

Water Distribution Materials - Backflow Preventers
Results
North Wales, PA 19454

Water Distribution Materials - Meter Pit Components
Term Contract
Results
North Wales, PA 19454

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Alexander Drive Basin Retrofit
Results
West Norriton, PA 19403

Fort Washington Cross County Trail and Road Diet, Phase 1
Results
$2,500,000 to $3,500,000 est. value
Fort Washington, PA 19034

Cowpath Road and Sourwood Drive Main Replacement Projects
Results
Less than $950,000 est. value
Lansdale, PA 19446

Jefferson Court - Water Quality BMP Improvements
Results
Trappe, PA 19426

Last Updated 05/14/2021 06:53 AM
Project Title

Fairview Village Adair Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Worcester, PA   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will generally include the furnishing and installation of 12 LF of 12-inch high density polyethylene corrugated pipe (HDPE); 494 LF of 15-inch HDPE pipe, 831 LF of 18-inch HDPE pipe; 519 LF of 24-inch HDPE pipe; 228 LF of 30-inch HDPE pipe; 28 inlets and one D-W endwall. Construction will occur in Township rights-of-way and easement areas, and involves pavement and easement restoration and includes provisions for all necessary erosion and sedimentation controls. In addition, the project includes potential Alternate/Add-On items of the relocation of an existing sanitary force main and the relocation of a water main.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents