Similar Projects
Last Updated | 04/24/2019 04:19 PM |
Project Title | B104 Lab Renovation CVM Main Building |
Physical Address | View project details and contacts |
City, State (County) | Raleigh, NC (Wake County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project scope includes the renovation of approximately 7,700 ASF on the first floor of the CVM Main Building on the NC State campus. The renovation area includes approximately 5,400 ASF of laboratory and support space and 2,300 ASF of office and storage space. The B104A lab must remain operational during the Fall and Spring semesters, and construction scheduling and phasing will be key to the success of the renovation. The majority of the construction is planned for summer 2019. The project will require architectural work, including casework, new ceilings and acoustical baffling, fixtures and finishes and some new walls; electrical work, including lighting, power and data and fire alarm; plumbing and structural work related to existing floor trenches that contain supply and waste piping for lab functions, and sprinkler work; and mechanical work, including re-routing duct work and removal and installation of a fume hood. | ||||||||||||||||||||||||||||||
Details | 1 College/University, 7,700 SF Renovation.
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |