Similar Projects
Cherese Woods Addition Street Improvements - Phase 2
Infrastructure
Bidding
Wichita, KS

2022 Water System Improvements
Infrastructure
Bidding
Junction City, KS

Planeview Water Main Replacement with Customer Service Line Replacement Planeview Subdivision No.1
Infrastructure
Post-Bid
Wichita, KS

Fairlane Commercial Center Water and Gas Utility Relocation
Infrastructure
Post-Bid
Louisburg, KS

Wyandotte County Water Line - Phase V
Results
$475,000 to $650,000 est. value
Kansas City, KS

2020 Water System Improvements - 340Th Street from Thrasher Road to Tumbleweed Road
Results
KS

Meter Readers
Infrastructure
Bidding
Oskaloosa, KS

Ford Meter Box Brass Service Materials
Infrastructure
Post-Bid
Topeka, KS

Water System Improvements
Results
Cambridge, KS

Ford Street Improvements
Infrastructure
Bidding
$1,500,000 est. value
Valley Center, KS

Turner`S Logistic Center West
New Construction
Post-Bid
Kansas City, KS

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Estelle - Random North Neighborhood Water Main Replacement Phase B
Infrastructure
Bidding
$300,000 est. value
Wichita, KS

North Lawrence Water Supply Redundancy Project
Infrastructure
Post-Bid
Lawrence, KS

KS Highway 68 Waterline Relocation Phase 3
Results
Paola, KS

Last Updated 04/18/2022 01:59 PM
Project Title

Boring Marsh of The Swans Water Supply Line

Physical Address View project details and contacts
City, State (County) Melvern, KS 66510   (Osage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Melvern Lake Project Office is looking to run a six-inch, seamless, high-density polyethylene, water line under 75 Highway. This gravity flow water line will supply water to our Marsh of The Swans area, East of our Outlet Park. This work will include directional boring a 6-inch HDPE under 75 Highway, from an area in our Outlet Park, to an area in the Marsh of The Swans. The Contractor shall provide all equipment, labor, supervision and material necessary to complete the project. The work is located 1/4-mile North of the Melvern Lake exit on 75 Highway, between the Outlet Park and The Marsh of The Swans area, at the United States Army Corps of Engineers (USACE) Melvern Lake Project

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents