Similar Projects
Reported | 12/18/2020 12:00 AM |
Project Title | GCC - Transfer Switch Disconnects Replacement |
Physical Address | View project details and contacts |
City, State (County) | West Palm Beach, FL 33401 (Palm Beach County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency - 10/28/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to replace two transfer switch disconnects. emove and replace two (2) existing ATS disconnect switches as specified in Exhibits “1” and “2”. Contractor will be responsible for coordinating all power outages with FPL and Palm Beach County at least 10 days in advance. Schedule FPL to open and secure emergency power switches feeding the ATS disconnects. Remove and replace existing 800A disconnect supplying ATS #1as specified in Exhibits “1” and “2”. Remove and replace existing 1000A disconnect supplying ATS #2as specified in Exhibits “1” and “2”. Remove and replace ATS #1 feeder as specified in Exhibits “1” and “2”. Remove and replace ATS #2 feeder as specified in Exhibits “1” and “2”. Remove and replace service entrance cables from FPL Vault to 800A disconnect as specified in Exhibits “1” and “2”. Remove and replace service entrance cables from FPL Vault to 1000A disconnect as specified in Exhibits “1” and “2”. Provide working space clearances per NEC table 110.26. Replace all grounding electrode conductors as specified in Exhibits “1” and “2”. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |