Similar Projects
Last Updated | 10/18/2021 05:33 AM |
Project Title | Thermoplastic Marking Replacement - Ponce De Leon Oper Maintenance - Remove and Replace Thermo |
Physical Address | View project details and contacts |
City, State (County) | (Holmes, Walton, Washington Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $900,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Improvements under this Lump Sum Site-Specific Contract consists of the refurbishment of six inch edge lines and skip lines and removal and replacement of all other thermoplastic pavement markings (arrows, messages, 8 inch, 12 inch, 18 inch and 24 inch striping) on asphalt surfaces as well as the removal of thermoplastic stripes/tape and placement of permanent tape on concrete covered roadway bridges, along State Road 8 (US Interstate 10) in Holmes, Walton, and a portion of Washington Counties Work includes on and off ramps. Locations are shown in Appendices. All work to be performed at night. A Traffic Control Officer will be required for all work zones. All thermoplastic stripes and markings removed shall be replaced in the same workday. Section 0001 Pavement Striping (Large Machine) (Lm) E999- 10- 41 Maintenance Lump Sum Contract Ls 1.000 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |