Similar Projects
Y--Slick Rock Culverts
Design
$200,000 to $400,000 est. value
Safford, AZ

Senator Highway Slope Improvements
Infrastructure
Bidding
$173,640 est. value
Prescott, AZ

Jerome Slide Area Mitigation (FY 2021-2022)
Infrastructure
Bidding
$256,630 est. value
Prescott, AZ

Gladden Farms Mike Etter Boulevard (North)
Post-Bid
Marana, AZ 85635

Pipelining and Drainage Services
Post-Bid
Phoenix, AZ 85007

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

South Recharge Phase II
Results
Less than $8,300,000 est. value
Gilbert, AZ 85233

Concrete Canal Lining Repair and Replacement
Term Contract
Bidding
Parker, AZ

Site drainage improvements at District Wide Sites
Post-Bid
Tucson, AZ 85743

CMAR Mountain Dell Channel Improvements
Results
Flagstaff, AZ 86001

Donnelly Wash Low Flow Crossing at Florence-Kelvin Highway
Infrastructure
Bidding
$1,200,000 est. value
Florence, AZ 85132

No Name Lake Backwater Rehabilitation Project
Post-Bid
Parker, AZ

High Desert Middle School Concrete and Drainage Project
Results
Less than $150,000 est. value
Globe, AZ 85501

Spillway Slope Repair
Infrastructure
Bidding
$450,000 est. value
AZ

Annual Culvert Pipe
Term Contract
Post-Bid
Safford, AZ

Last Updated 09/23/2021 02:17 PM
Project Title

Y--Slick Rock Culvert Replacement

Physical Address View project details and contacts
City, State (County) Safford, AZ   (Graham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of culvert pipes at 3 locations on Haekel Road, located approximately 30 miles southeast of Safford, AZ.The work consists of replacing existing (5) pipes with (5) new 57” x 38” galvanized steel pipe-arch culverts on Slick Rock culvert bridge. At the second site, replacing (2) 24” Round x 40’ length pipes with (2) new 49” x 33” x 40’ galvanized steel pipe-arch culverts. At the third site, replacing existing (1) pipe 30” x 24” with new 30” x 24” galvanized steel pipe-arch culvert.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents