Similar Projects
Duckworth Park Walking Trail Construction Recreation Trails Program
Infrastructure
Bidding
$2,000,000 est. value
Columbia, MS

Curb and Gutter / Flatwork- 12 Months Supply
Infrastructure
Bidding
Tupelo, MS

Milam Elementary School Parking Lot Addition & Improvements
Post-Bid
Tupelo, MS 38804

Walkways and Building Joints Improvements for Whitten Middle School
Post-Bid
Jackson, MS 39212

Lanier High School Parking Improvements and JROTC Drainage Repair
Results
Jackson, MS 39203

Parking Lot Paving Striping Improvements - Tupelo Police Department
Results
Tupelo, MS 38804

Baseball Stadium Front Walk Access
Infrastructure
Bidding
$400,000 est. value
Oxford, MS 38655

Northeast Mississippi Community College Parking Lots "A" Through "E" Resurfacing
Renovation
Post-Bid
Booneville, MS 38829

6-09446 NE Bid - 1063 Sidewalk and Lighting
Results
Booneville, MS 38829

Parking Lot Construction, Walter Payton Field and Columbia High School
Infrastructure
Bidding
$500,000 est. value
Columbia, MS

L and L Park Trail Construction Recreation Trails Program
Post-Bid
New Hebron, MS

Starkville Sportsplex Parking Lot Expansion
Results
Starkville, MS 39759

Sidewalk Improvements at the Howell C. Garner Instructional Center
Infrastructure
Bidding
$400,000 est. value
Natchez, MS 39120

Construction of Pedestrian and Sidewalk Improvements Raymond Campus
Post-Bid
Raymond, MS 39154

East Jackson Avenue Streetscape
Results
$1,477,064 est. value
Oxford, MS 38655

Reported 06/10/2022 12:00 AM
Project Title

Repair and Maintenance Project

Physical Address View project details and contacts
City, State (County) Ovett, MS 39464   (Perry County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the following: 1. Clay gravel access road and maintenance parking area reconstruction; 2. Leachate repairs, cover soil installation, and grassing over the active landfill site; 3. Sediment pond silt removal; 4. Grading and stabilization of borrow pit.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents