Similar Projects
Tennis Center - Construction - Town of Flower Mound
Infrastructure
Conception
$12,250,000 CJ est. value
Flower Mound, TX 75022

Aberdeen Drive Phase II - Town of Flower Mound
Infrastructure
Conception
$2,100,000 CJ est. value
Flower Mound, TX 75022

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Loreto House
New Construction - 6,500 SF
Design
$1,000,000 est. value
Flower Mound, TX 75028

Admissions Building Foundation Stabilization
Infrastructure
Post-Bid
Denton, TX

Pecan Square Phase 3A and Mulkey Lane Improvements for Clearing and Mass Grading
Infrastructure
Post-Bid
Northlake, TX

Annual Requirements Contract for Directional Boring
Term Contract
Results
Arlington, TX

Northlake Estates Phase 3 - Grading Improvements
Infrastructure
Results
TX

Connections Wellness Medical Offices
New Construction - 19,800 SF
Construction
$5,000,000 est. value
Denton, TX 76210

Garden Oaks Family & Cosmetic Dentistry
New Construction - 5,243 SF
Construction
$600,000 est. value
Denton, TX 76210

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Frisco Performing Arts Center and Related Facilities
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Frisco, TX 75034

2022-23 Playground Replacements (Cortadera, Wilkerson, Possum) - Town of Flower Mound
Infrastructure
Conception
$750,000 CJ est. value
Flower Mound, TX 75022

Health Science Center
Renovation
Design
Denton, TX

Cambria Hotel Northlake Texas
New Construction, Infrastructure - 84,966 SF
Post-Bid
$31,100,000 CJ est. value
Northlake, TX 76262

Last Updated 03/02/2023 11:01 AM
Project Title

Frisco Medical Pavilion II

Physical Address View project details and contacts
City, State (County) Frisco, TX 75033   (Denton County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Medical facility. As of March 1, 2023, this project is underway.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents