Similar Projects
Heron Pond - Carpio Sanguinette Park, A and B
Infrastructure
Bidding
Denver, CO

Las Animas SFU Pond Liner Replacement
Infrastructure
Bidding
Denver, CO

64th Avenue Reinforced Concrete Box Culvert Fabrication
Post-Bid
Denver, CO

R3 Culvert Lining
Post-Bid
Denver, CO 80204

NWC Animal Health Building Soils Remediation
Results
Less than $2,214,000 est. value
Denver, CO 80216

Wq Reg High Line Canal (Construction)
Results
$1,050,000 to $1,300,000 est. value
Denver, CO

Delaney Lakes Inlet Repair
Infrastructure
Bidding
Denver, CO

Filing 34 Central Park Station Plaza
Infrastructure
Post-Bid
Denver, CO

Culvert Repair
Results
Denver, CO 80204

Ft Morgan Poe Scale Pit Drain
Infrastructure
Post-Bid
$30,000 est. value
Denver, CO

Grays Peak General Storm
Results
$4,400,000 to $4,800,000 est. value
Denver, CO

Construction of Filing 40th Avenue Extension
Infrastructure
Post-Bid
Denver, CO 80238

NW and SW Aquatic Habitat Design-Build Projects
Results
Less than $350,000 est. value
Denver, CO

Removal of Portions of Present Structure, Removal of Fence and Facing Block
Results
Denver, CO 80239

Transport Sub Area 1 Filing 1 Road and Utility Construction Project
Infrastructure
Results
Denver, CO

Last Updated 10/15/2021 06:58 PM
Project Title

Marion Street System Phase 2

Physical Address View project details and contacts
City, State (County) Denver, CO 80238   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,100,000 to $4,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to extend a storm drain system from Phase 1 (between MLK Blvd. and E. 27th Avenue) across two city blocks and is to end at E. 25th Avenue. The majority of the work consists of open cut construction of a 8x8 box, a 96 RCP, lateral pipes, inlets, manholes, and drainage structures. Other areas of work include waterline relocation and surface restoration (paving) in areas where construction impacts the existing infrastructure.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents