Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure - 278,212 SF
Design
$33,000,000 CJ est. value
Forney, TX 75126

South Pointe Park at Kaufman Sports Village Addition
New Construction, Infrastructure - 147,100 SF
Design
$130,000,000 CJ est. value
Kaufman, TX 75142

Kingsborough East Wastewater Treatment Facility Phase 1 - Lease
New Construction, Infrastructure
Bidding
$9,950,650 CJ est. value
Crandall, TX 75114

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Grading Improvements for Las Lomas Phase 2
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Kaufman, TX 75142

2019-2020 TxCDBG Drainage Improvements
Infrastructure
Results
$171,605 CJ est. value
Kemp, TX 75143

Walden Pond West Phase 1 Grading Improvements
Infrastructure
Results
$1,152,730 CJ est. value
Kaufman, TX 75142

High Point Special Utility District New Headquarters
New Construction, Infrastructure - 5,364 SF
Construction
$3,000,000 CJ est. value
Forney, TX 75126

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Construction
$696,000 CJ est. value
Kaufman, TX 75142

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Crossroads at Terrell Phase 2
New Construction, Infrastructure - 366,577 SF
Design
$43,885,000 CJ est. value
Terrell, TX 75160

Water, Sanitary Sewer and Storm Drainage Improvements for Las Lomas Phase 2
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Kaufman, TX 75142

Utilities and Paving Improvements to Serve Falcon Heights Village 2
Infrastructure
Results
TX

The Learning Experience
New Construction, Infrastructure - 10,000 SF
Construction
$1,900,000 CJ est. value
Forney, TX 75126

Last Updated 10/16/2023 10:40 AM
Project Title

The Paving Improvements for Kingsborough, Phase 1A

Physical Address View project details and contacts
City, State (County) Kaufman, TX 75142   (Kaufman County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,456,677 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For The Paving Improvements for Kingsborough, Phase 1A- Scope of Work: 60 Lots 4,900 LF 12" Waterline 2,000 LF 8" Waterline 2,600 LF Sanitary Sewer 1,400 LF Storm Drain Outfall Structures & Drainage Channels 15,200 SY Concrete Placement 1,250 SY Asphalt Placement It is anticipated that the same utility contractor will be awarded the Kingsborough, Phase 1A Utility Improvements contract and the Kingsborough East, Master Utility Improvements contract, which will be treated as one project with a concurrent construction schedule. The district reserves the right to award in this or in a different manner if it is most advantageous to the District and results in the best and most economical completion of the District's proposed facilities as defined by TWC 49.273. The Kingsborough, Phase 1A Paving Improvements contract will be awarded separately. Bidders must register on this website to submit an electronic bid. Contractors will electronically enter into the bid proposal, found , their proposed pricing and upload only the bid security. Separate bid proposals shall be submitted for each project. Electronic bids do not include bids submitted by telegraphic or facsimile transmission LGI Homes - Texas, LLC. on behalf of Kaufman County Fresh Water Supply District No. 7A and JLM 717 Kaufman, L.P. on behalf of Kaufman County Fresh Water Supply District No. 7A reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273) Separate bid securities in the form of bid bond or cashier's check payable to LGI Homes - Texas, LLC. on behalf of Kaufman County Fresh Water Supply District No. 7A and JLM 717 Kaufman, L.P. on behalf of Kaufman County Fresh Water Supply District No. 7A in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same. Site Info: 12" waterline to extend through future Phase 2 and connect to LJAproposedwaterlineSewer to connect to LJA proposed trunk sewer line FEMA Floodplain on site Evans Road improvements Kingsborough East: Kingsborough East Master Gravity Sewer Main Improvements are located in the City of Talty ETJ and consist of approximately 289 LF of sewer main. Kingsborough East Master Water Main Improvements are located in the City of Talty ETJ and consist of approximately 2,666 LF of water main Job No-7018500, NT640-0061, 365.22, D211184

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents