Similar Projects
Center Street Sidewalks
Infrastructure
Bidding
$400,000 est. value
Rock Island, WA 98850

Center Street Sidewalks
Infrastructure
Bidding
$400,000 est. value
Rock Island, WA 98850

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Pangborn Memorial Airport Taxiway A Realignment
Infrastructure
Post-Bid
East Wenatchee, WA 98802

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stormwater and Accessible Sidewalk Upgrades at Mansfield School
Infrastructure
Results
$495,000 est. value
Mansfield, WA 98830

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Reservoir 2 and Water System Improvements
Infrastructure
Results
$2,800,000 to $3,200,000 est. value
Bridgeport, WA

Parking Lot Paving at Canyon View Community Facility
Infrastructure
Post-Bid
$200,000 est. value
East Wenatchee, WA 98802

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Hot Mix Asphalt
Infrastructure
Post-Bid
East Wenatchee, WA

Reported 07/01/2022 12:00 AM
Project Title

9th Street North East and Valley Mall Parkway Intersection Improvements

Physical Address View project details and contacts
City, State (County) East Wenatchee, WA 98802   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of roadway work shaill include, but not limited. to signalization, traffic control, sidewalk, curbing, paving, striping, ADA ramp improvements, illumination, stormwater system improvements, water main system modifications, and related work in accordance with the contract plans, special provisions, and the WSDOT/APWA Standard specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents