Similar Projects
Springdale Creek Streambank Stabilization
Infrastructure
Bidding
$406,000 est. value
Peoria, IL 61640

Culvert Replacement for East Branch of Dry Run Creek at West Merle Lane
Infrastructure
Bidding
$300,000 est. value
Peoria, IL 61604

Corrugated Structural
Infrastructure
Post-Bid
Peoria, IL

Lawndale Drainage Improvements
Infrastructure
Post-Bid
Bartonville, IL 61607

GPSD Sewer Rehabilitation; Erosion Control, Project 2
Results
Less than $1,400,000 est. value
Peoria, IL 61600

Kickapoo Creek Road Structure Replacement
Results
Less than $1,500,000 est. value
Peoria, IL

Dirksen Drainage Improvements
Infrastructure
Post-Bid
Peoria, IL

Slope Repair and Drainage Improvement
Infrastructure
Results
IL

Todd School Road (C.H. D56) Improvements
Infrastructure
Post-Bid
IL

Slope Stabilization and Landscaping
Infrastructure
Results
Peoria, IL

Stadium and North Parking Lot Drainage Improvements
Infrastructure
Post-Bid
Peoria, IL

Removal of the Three 36-Inch Diameter Culverts
Infrastructure
Results
IL

Drainage Improvements
Infrastructure
Results
$45,470 est. value
Mossville, IL

Slane Road Culvert
Infrastructure
Results
Peoria, IL

Combined Sewer Overflow Control Project - Year 1
Infrastructure, Alteration
Results
Peoria, IL

Last Updated 04/20/2022 12:08 PM
Project Title

Storm Drainage Repair Annual Contract 2022

Physical Address View project details and contacts
City, State (County) Peoria, IL   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of inspecting, repairing, and replacing storm drainage infrastructure at locations as directed by the Owner’s Representative. Work will include new storm sewer pipe, cured-in-place pipe lining, manholes, inlets, curb and gutter, slope stabilization, retaining walls, and erosion control practices. Site restoration shall include pavement replacement, topsoil placement, sodding, seeding, fertilizing, and mulching at locations as directed by the Owner’s Representative. Necessary adjustments, incidentals and appurtenant items shall be constructed as directed by the Owner’s Representative.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents