Similar Projects
Norwalk Roof and HVAC Department of Motor Vehicles Branch Office Facility
Bidding
$831,343 to $875,097 est. value
Norwalk, CT 06851

Avery Point Academic Building Roof Replacement Avery Point Campus Project
Post-Bid
Storrs, CT

Fine Arts - Roof Replacement
Post-Bid
Less than $1,000,000 est. value
Storrs, CT

Roofing Replacement
Results
Stamford, CT 06902

Roofing
Results
Monroe, CT

On-Call Trade Roofing Contractor Program
Post-Bid
$100,000 to $500,000 est. value
Storrs, CT

Southside Terrace Roof Replacement
Results
Less than $116,880 est. value
Wallingford, CT

Engine 3 4 Roof Replacement
Post-Bid
Bridgeport, CT

Roof Replacement - Hall Memorial Library
Results
Less than $168,820 est. value
Ellington, CT

Housing Rehabilitation - 14 Leonard Road - Roof
Post-Bid
Enfield, CT 06082

Partial Library Roof Replacement of the Weston Public Library
Results
Weston, CT

Housing Rehabilitation - 14 Leonard Road
Post-Bid
Enfield, CT 06082

Heminway Town Hall Partial Roof Replacement
Results
Watertown, CT

Darien Public Schools Central Office Building Partial Roof Replacement and Repairs
Post-Bid
$150,000 est. value
Darien, CT 06820

Andover Museum Roof Replacement Project
Results
Less than $10,000 est. value
Andover, CT

Reported 02/13/2019 12:00 AM
Project Title

Replace Roof Munro Hall USCG Acacdemy New London CT Project #2524388

Physical Address View project details and contacts
City, State (County) New London, CT 06320   (New London County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Provide all equipment, materials, labor, and supervision necessary to completely remove and replace existing main roof, penthouse roof, 3rd floor entry canopy roofs, insulation, roof drains, wall flashing, edge flashing, etc. at Munro Hall as noted on drawings. Abatement: Some locations the original roof mastic (bottom layer next to concrete) where noted contain asbestos and shall be removed and properly disposed of by a licensed asbestos abatement contractor. The existing multi-ply built-up roof membrane does not contain asbestos. The existing paint is assumed to be lead based due to the age of the building. Follow all lead safety precautions and regulations when cutting, sanding, etc. any painted surfaces containing lead. Lead abatement is not part of the project, except as noted on drawings. Removal: Protect existing building components, landscaping, etc. that are to remain from damage. Remove, salvage, and recycle metal copings, flashing, miscellaneous metal, etc. recycle as noted in documents and provide credit to the Government. Completely remove existing multi-ply built-up roof system, insulation, vapor barrier, flashing, etc. down to the concrete deck. The existing multi-ply built-up roof membrane does not contain asbestos. Some roof mastic contains asbestos where noted. Remove existing roof hatches and safety rails. Remove and recycle, or properly dispose of, all construction debris. Installation: Patch and repair concrete decks as required for installation of new roof system. Extent of any patching and repair of concrete roof decks will be determined by inspection after deck is exposed and will be addressed by change order at that time. Provide a membrane roof system, including fully adhered vapor barrier, polyisocyanurate insulation, tapered insulation board, high density cover board, EPDM membrane, flashing, etc. Provide new wood blocking, EPDM flashing at walls, pipe penetrations, etc., metal flashing, and all required accessories for a complete and watertight roof system. Provide new lead coated copper edge flashing as noted on drawings. Remove and replace several courses of brick at wall flashing, new brick to match existing, replace wall flashing and counter flashing with 20 oz lead coated copper flashing, add weeps to joints above flashing and point joints with lime mortar. Remove and replace existing roof drains and dome strainers, cast iron pipe and fittings, and connect to existing roof leaders, ten (10) locations. Remove and replace existing roof hatches and safety rails. Provide new paint ladder between main roof and penthouse roof.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents