Similar Projects
Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

Wearing Surface Repairs and Related Work (Including Painting) BR No. W-44-098 (Steel) Interstate 190 (NB and SB) Over the P and W Railroad
Bidding
Less than $3,695,290 est. value
Worcester, MA

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations
Post-Bid
Less than $5,090,000 est. value

Scheduled and Emergency Bridge Steel Beam Repairs (including Painting) at Various Locations Excluding the Islands
Results
Less than $1,539,000 est. value

Replacement of Fisher Street Bridge over Assabet River
Results
$1,100,000 est. value
Westborough, MA 01581

Queen Lake Road Bridge Rehabilitation Project
Bidding
$500,000 est. value
Phillipston, MA 01331

Bridge Structural Repairs and Related Work (Including Painting) along Interstate 495
Results
Less than $2,765,000 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Bidding
$1,847,645 est. value

Scheduled and Emergency Bridge Deck Repairs at Various Locations on Interstate 90
Results
Less than $2,351,000 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,489,000 est. value

Scheduled and Emergency Structural Repairs at Various Locations
New Construction
Bidding
$1,459,640 est. value

Bridge Structure Repairs (Including Painting) at Various Locations
Results
Less than $960,000 est. value

Scheduled and Emergency Bridge Structural Repairs at Various Locations
Results
Less than $1,267,525 est. value

Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Results
Less than $2,247,400 est. value

Last Updated 07/08/2020 10:06 AM
Project Title

Bridge Replacement BR No U-02-041 (NEBT Beams) Route 146 Northbound Over the Mumford River

Physical Address View project details and contacts
City, State (County) Uxbridge, MA 01569   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,710,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $31000","100." "2.000","Ea","Tree Protection - Armoring & Pruning","102.511" "40.000","Ft","Tree And Plant Protection Fence","102.521" "3.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "1.000","Ls","Demolition Of Superstructure Of Bridge No. u-02-041","114.1" "2100.000","Cy","Unclassified Excavation","120.1" "230.000","Cy","Reinforced Concrete Excavation","127.1" "258.000","Cf","Reinforced Concrete Excavation For Repairs","127.12" "420.000","Cy","Bridge Excavation","140." "430.000","Cy","Class a Trench Excavation","141." "20.000","Cy","Test Pit For Exploration","141.1" "10.000","Cy","Class b Rock Excavation","144." "2.000","Ea","Drainage Structure Removed","146." "700.000","Cy","Ordinary Borrow","150." "900.000","Cy","Gravel Borrow","151." "475.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "2.000","Cy","Controlled Density Fill - Non-Excavatable","153.1" "206.000","Ton","Crushed Stone","156." "35.000","Ton","Crushed Stone For Integral Abutment","156.6" "850.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "4.000","Ea","Catch Basin","201." "1.000","Ea","Manhole","202." "1.000","Ea","Gutter Inlet","204." "20.000","Ea","Drainage Structure Adjusted","220." "1.000","Ea","Drainage Structure Remodeled","220.5" "2.000","Ea","Frame And Cover - Secured","221.1" "9.000","Ea","Frame And Grate - Massdot Bar Type","222." "8.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "40.000","Cy","Removal Of Drainage Structure Sediment","227.3" "150.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "50.000","Ft","10 Inch Ductile Iron Pipe","238.10" "50.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "40.000","Sy","Hot Mix Asphalt Waterway","280." "100.000","Ton","Dense Graded Crushed Stone For Sub-Base","402.1" "7800.000","Sy","Pavement Standard Milling","415.1" "3800.000","Lb","Calcium Chloride For Roadway Dust Control","440." "10.000","Mgl","Water For Roadway Dust Control","443." "250.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "800.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "800.000","Ton","Superpave Intermediate Course - 12.5 Polymer (Sic -12.5 - p)","450.311" "500.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "120.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "45.000","Ton","Superpave Bridge Surface Course - 12.5 Polymer (Ssc-b - 12.5 - p)","450.611" "45.000","Ton","Superpave Bridge Protective Course – 12.5polymer (Spc-b - 12.5 - p)","450.711" "1250.000","Gal","Asphalt Emulsion For Tack Coat","452." "8000.000","Ft","Hma Joint Sealant","453." "20.000","Ton","Hot Mix Asphalt Berm, Type a","470." "95.000","Ton","Asphalt Mixtures For Temporary Work","472." "3130.000","Ft","Milled Rumble Strip","477." "2150.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "250.000","Ft","Granite Curb Type Va5 - Straight","505." "900.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "2.000","Ea","Trailing Anchorage","627.1" "1.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "3.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "2.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "4.000","Ea","Transition To Bridge Rail","628.24" "610.000","Ft","Highway Guard Removed And Reset","630." "1150.000","Ft","Highway Guard Removed And Discarded","630.2" "550.000","Ft","Temporary Fence","657." "14.000","Ea","Silt Sack","697.1" "450.000","Sy","Geotextile Fabric For Separation","698.3" "26.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "375.000","Cy","Loam Borrow","751." "24.000","Hr","Wood Turtle Protection Plan For Bridge Projects","754.30" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "1100.000","Sy","Seeding","765." "2700.000","Sy","Seeding-Low Upland Mix-Full Sun","765.412" "450.000","Sy","Roadside Part Shade - Riverbank Mix","765.442" "3050.000","Ft","Sediment Control Barrier","767.121" "450.000","Sy","Composted Mulch Over Modified Rock","767.78" "1950.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "1.000","Ls","Roadside Guide Sign Removed And Reset","829.061" "3.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "1.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/2 Brkway Post Assemblies-Steel","848.1" "650.000","Sf","Safety Signing For Traffic Management","852." "2500.000","Ft","Temporary Barrier - Limited Deflection Removed And Reset","853.211" "1400.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "20.000","Day","Truck Mounted Attenuator","853.403" "2.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "1.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "30.000","Day","Temporary Illumination For Work Zone","853.8" "16000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "520.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "8000.000","Sf","Pavement Marking Removal","854.1" "25.000","Day","Arrow Board","856." "70.000","Day","Portable Changeable Message Sign","856.12" "33000.000","Day","Reflectorized Drum","859." "870.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "22.000","Ea","Slotted Pavement Marker One-Way White","864.31" "2300.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "1800.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "4.000","Ea","Miscellaneous Signs Removed And Reset","874.45" "9.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "15.000","Cy","Rapid Setting Concrete (Low Absorption)","904.14" "3500.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "542.000","Ft","Steel Pile Hp 10 x 57","942.102" "2.000","Ea","Dynamic Load Test By Contractor","948.41" "14.000","Ea","Pile Shoes","948.5" "1.000","Ls","Temporary Shoring","950.1" "300.000","Ton","Modified Rockfill","986." "122.000","Sy","Special Slope Paving Under Bridge - Cement Concrete","987.3" "1.000","Ls","Temporary Protective Shielding Bridge No. u-02-041","994.01" "1.000","Ls","Bridge Structure, Bridge No. u-02-041","995.01"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents