Last Updated | 01/06/2023 12:12 AM |
Project Title | Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Webster, FL 33597 (Sumter County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,891,608 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: SUMTER Road Name: SR 50 Limits: FROM E OF SR 471 TO LAKE CO LINE Project(s): 44316615201(*) Federal Aid No: D522037B Total Roadway Length: 6.393 Miles Contract Days: 190 Total Bridge Length: 0.000 Miles Total Proposal Length: 6.393 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Calendar Days The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, signing and pavement markings, and other incidental construction on SR 50. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 011 - Resurfacing |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |