Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - SR 47 (US 441) from North of SR 8 (I-10) to Deep Creek
Infrastructure
Bidding
$891,847,700 CJ est. value
Lake City, FL 32024

RFP D/B - SR 47 (US 441) from North of SR 8 (I-10) to Deep Creek
Infrastructure
Bidding
$891,847,700 CJ est. value
Lake City, FL 32024

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Resurfacing - SR 10
Infrastructure
Results
$9,255,453 est. value
FL

Add Left Turn Lane(s)/Milling and Resurfacing/Base Work/Drainage Improvements - SR 47
Infrastructure
Results
$1,473,526 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Rountree Moore Chevrolet
New Construction, Infrastructure - 25,480 SF
Pending Verification
$5,800,000 CJ est. value
Lake City, FL 32055

RFP Engineering - SR 25 (US 41/US 441) at SR 238 Intersection Improvement
Infrastructure
Bidding
$1,250,000 CJ est. value
Lake City, FL 32025

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Asphalt Concrete
Infrastructure
Results
$400,000 est. value

SR 20 (US 27) from the Alachua County Line to the Suwannee County Line
Infrastructure
Post-Bid
$11,735,613 est. value
Fort White, FL 32038

SR 8 - Resurfacing
Infrastructure
Results
$38,211,551 est. value

Last Updated 01/06/2023 12:11 AM
Project Title

Resurfacing - SR 8 (I-10)

Physical Address View project details and contacts
City, State (County) Lake City, FL 32055   (Columbia County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $16,754,450 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Dist/st-wide Road Name: Sr 8 (I-10) Limits: From E of Sr 51 (Us 129) to E of the Columbia Co Line Project(s): 44554425201(*) Federal Aid No: D222076B Total Roadway Length: 10.651 Miles Contract Days: 270 Total Bridge Length: 0.048 Miles Total Proposal Length: 10.699 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail and pier protection barrier construction, wrong way driving vehicle detection system installation, traffic monitoring site upgrades, bridge joint repairs, ditch pavement construction, and other incidental construction on SR 8 (I-10) from east of SR 51 (US 129) (MP 15.132) in Suwannee County to east of the Columbia County Line in Columbia County (MP 0.323). Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 Resurfacing - SR 8 (I-10)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents