Similar Projects
Last Updated | 07/19/2023 01:06 PM |
Project Title | Phase 2 Bond Improvements at Briarcliff Manor MS/HS Todd Elementary School - General Contractor Work (GC-1) |
Physical Address | View project details and contacts |
City, State (County) | Briarcliff Manor, NY 10510 (Westchester County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $6,375,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | File NO: 2042839.052 BRIARCLIFF MANOR MIDDLE/ HIGH SCHOOL SED No.: 66-14-02-02-0-004-023 TODD ELEMENTARY SCHOOL SED No.: 66-14-02-02-0-002-021 The project includes interior renovations to library, offices, and classrooms. Locker relocations for egress. Handrail and Guardrail replacements. Exterior Masonry Reconstruction Combustion Air intake Louiver Reconstruction Ductwork and Chilled Water Piping insulation. Replacement of rooftop units, Acid neutralization. natural gas leak detection system. Hardwired CO detectors in select areas. Select Student toilet rooms reconstruction. Checks for deposits shall be made payable to the DISTRICT, BRIARCLIFF MANOR UNION FREE SCHOOL DISTRICT and may be uncertified. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Contract will be awarded to the lowest responsible bidder or the proposals will be rejected within 45 days of the date of opening proposals. Bids shall be subject, however, to the discretionary right reserved by the School District to waive any informalities, accept or reject any alternatives, reject any proposals and to advertise for new proposals, if in its opinion the best interest of the School District will thereby be promoted. Each bidder may not withdraw his bid within 45 days after the formal opening thereof. A bidder may withdraw his bid only in writing and prior to the bid opening date. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |