Similar Projects
Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Electrical Motors Overhaul Services
Term Contract
Bidding
San Diego, CA 92106

Pipeline 5 Relining, North Twin Oaks Valley Road to Crossover Pipeline Turnout
Infrastructure
Bidding
$27,000,000 est. value
San Diego, CA

Design of Otay 2nd Pipeline St Replacement Ph 5
Infrastructure
Post-Bid
$200,000 to $2,500,000 est. value
San Diego, CA 92101

Chilled Water System
Infrastructure
Post-Bid
San Diego, CA

Recycled Air/Vac & Drain Replacement Project
Alteration
Results
$50,000 est. value
Fallbrook, CA 92028

City of Poway Treated Water Facilities and Redundant Pipeline Project
Infrastructure
Results
$1,310,000 est. value
Poway, CA 92064

Scripps Ranch Improvement 1
Infrastructure
Bidding
$5,930,000 est. value
San Diego, CA

Construction Management for Alvarado 2nd Pipeline
Term Contract
Post-Bid
$300,000 to $350,000 est. value
San Diego, CA

SDIA - Airport Administration Building - Underground Utilities
Infrastructure
Results
San Diego, CA 92108

Gordon Hill Road Pipeline Replacement Project
Infrastructure
Bidding
$2,450,000 est. value
Valley Center, CA 92082

Job Order Contract (Joc) Pipeline
Infrastructure
Post-Bid
$40,000,000 est. value
San Diego, CA

AC Water & Sewer Group 1052
Infrastructure
Results
$14,610,000 est. value
San Diego, CA 92101

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

Water Group Job 952
Infrastructure
Post-Bid
$8,610,000 est. value
San Diego, CA

Last Updated 06/27/2022 03:49 PM
Project Title

Upgrade Domestic Hot and Cold Water Systems

Physical Address View project details and contacts
City, State (County) San Diego, CA 92161   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1, Install a new point-of-entry Copper / Silver Ionization system at the main water service entrance in Building 2. Remove dead legs from the existing water system by capping dead legs at the domestic water supply within 1.5x the diameter of the dead leg pipe. Provide Thermostatic mixing valves for all existing fixtures that lack them, and recalibrate existing ones. Provide a domestic cold water shell and tube heat exchanger (with chilled water) to limit the temperature of incoming water from the City of San Diego. Provide a circulation system for Domestic Cold Water within Building 1 to ensure control of DCW water temperature at the most distant distribution point. Replace existing DCW and DHW valves with full-port ball valves to mitigate any future build-up of bacteria. Use of electric point-of-use water heaters at (2) temperature deficient fixture locations. Provide automated monitoring through the installation of sampling stations at distal points throughout Buildings 1, 2, and 11. These sampling stations will monitor, at a minimum, the following: Chlorine levels in the domestic hot and cold-water systems Temperature in the domestic hot and cold-water systems pH levels in the domestic hot and cold-water systems Total Dissolved Solids (TDS) in the domestic hot and cold-water systems.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents