Similar Projects
Yorkshire Subdivision
New Construction, Infrastructure
Conception
$6,260,000 CJ est. value
Reno, NV 89501

City Hall - Southeast ADA Ramp Improvements - Construction - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

RFQ Construction Manager at Risk - NV Cares Campus Improvements
Infrastructure
Design
$9,300,000 CJ est. value
Reno, NV 89512

AutoZone #4163 / Sparks
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Sparks, NV 89431

Hospital Second Source Water Line and PRV Project
Infrastructure
Bidding
$300,000 CJ est. value
Reno, NV 89501

Barrier Rail Upgrade, Culvert Lining and Replacement, Hardware Upgrade for ITS Devices, Aesthetic and Fencing Improvements
Infrastructure
Bidding
$16,500,000 CJ est. value
Patrick, NV 89434

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

NOAA Radar Site Access Road Maintenance
Post-Bid
NV

UNR - Repair and Resurface Parking Deck at 745 W Moana Lane
Results
Reno, NV 89509

2021-2022 Slurry Seal For Selected Streets
Results
NV

Quick Quack Car Wash / Reno
New Construction, Infrastructure - 3,597 SF
Pending Verification
$800,000 CJ est. value
Reno, NV 89506

North Sierra Street Mixed Use
Infrastructure, Renovation
Pending Verification
$6,500,000 CJ est. value
Reno, NV 89501

Maintenance Garage - West Side Parking Lot Rehabilitation - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

Spring Creek Zone Conversion
Infrastructure
Bidding
$2,893,715 CJ est. value
Reno, NV 89501

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 09/26/2022 03:39 PM
Project Title

Construct Median Islands, Turn Lane, Lighting Improvements, and a Shared Use Path With Hydraulic Improvements

Physical Address View project details and contacts
City, State (County) Reno, NV 89511   (Washoe County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Type: District-2 Contract Cost Range: R24 ($3,850,000.01 to $4,600,000) Funding Type: STATE County(s): WASHOE Enterprise Goal: 7.3% Location: SR 431 Mount Rose Highway from Thompson Lane to Wedge Parkway construct median islands, turn lane, lighting improvements, and a shared use path with hydraulic improvements Prequalification Required: Y Route(s): SR431-1 Milepost(s): MP WA 19.45 to MP WA 23.06 Contract Days: 65 (working) Liquidated Damages: $4,800.00 Project Length: 2.0000 mi NVDOT - Construct Median Islands, Turn Lane, Lighting Improvements, and a Shared Use Path With Hydraulic Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents