Similar Projects
Lining Services for Flagstone Drainage Main
Infrastructure
Results
$325,000 est. value
Hudson, NH

Culvert Pipe
Term Contract
Post-Bid
Pelham, NH

Rehabilitate Corrugated Metal Culvert Carrying Bowman Brook Undfer NH 114
Infrastructure
Bidding
$488,475 est. value
Bedford, NH

Concrete Sewer and Drainage Structures
Infrastructure
Bidding
Manchester, NH

(PVC) Poly Vinyl Chloride Plastic Sewer Pipe and Corrugated Polyethylene Drainage Pipe
Term Contract
Results
Manchester, NH

Drainage Rehabilitation along the Turnpike System
Infrastructure
Bidding
$538,562 est. value

Forestview Cemetery Irrigation System
Results
Amherst, NH

Lyndeborough Road Culvert Replacement
Infrastructure
Results
New Boston, NH

Sewer & Drain Pipe
Infrastructure
Bidding
Manchester, NH

Culvert, Reinforced Concrete Pipe Class IV and V
Term Contract
Bidding

Highway Department Items - High Density Polyethylene Culvert Pipe
Term Contract
Results
Pelham, NH

Rehabilitate 90" Structural Plate Pipe under NH 101 and Boyton Street in Bedford
Results
Less than $1,200,580 est. value
Bedford, NH 03110

Wasserman Park Beach Restoration Project
Results
Merrimack, NH

Septic and Floor Drain Line Services
Results

Massabesic Lake Dam Rehabilitation
Infrastructure
Results
Manchester, NH

Last Updated 03/11/2022 12:17 PM
Project Title

Remove Debris, Reinforce Retaining Wall

Physical Address View project details and contacts
City, State (County) Manchester, NH 03101   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $686,402
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fill Voids, Grade To Level Contour, Approximately 40,000 Sf Of Concrete Foundation And Slab On Grade Let After The Demolition Of The Concord Steam Plant. Reinforce The Existing Retaining Wall. 901 Fill Level Grade And Reinforce Retaining Wall u 1.00 902 Allowance For Unforeseen Conditions $ 62,400.00 903 Crushed Stone Fine Cy 210.00 904 Compacted Gravel Fill Cy 1,200.00 905 Flowable Fill Cy 350.00 81178b Add Alternate - Add Alternate 1 - State 991 Add Alternate 1 All Materials Equipment And Labor To Complete Work For Drawing Number c 3.0 u 1.00

Details

Division 07 - Thermal and Moisture Protection, Roof Specialties, Manufactured Gutters and Downspouts, Gutter Debris Guards.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents