Similar Projects
Cottonwood Improvement District - Rehab 2021 Sewer Pipeline
Bidding
Sandy, UT

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Williams Building - Storm Water Conservation Garden
Results
$868,336 est. value
Salt Lake City, UT 84108

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Hillside Lane Storm Drain
Results
$150,000 to $200,000 est. value
Salt Lake City, UT 84106

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

Scottish Drive Storm Drain and Waterway Project
Post-Bid
Cottonwood Heights, UT 84093

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Storm Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Crown Street Storm Drain Improvement Project
Results
Taylorsville, UT 84129

Retrofit Existing Stormwater Grate
Post-Bid
Riverton, UT 84096

Red Butte Garden Service Road Project
Results
$265,521 est. value
Salt Lake City, UT 84112

Last Updated 02/23/2021 12:03 PM
Project Title

Welby Pump Station Canal Turnout and Storm Drain Sleeve

Physical Address View project details and contacts
City, State (County) South Jordan, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of a secondary irrigation water turnout structure on the Welby Canal and a storm drainpipe crossing of the canal near 10200 South and 3788 West. The project includes the furnishing and installation of all materials; all labor; supplies; tools, equipment, parts, rentals, fuels, utilities, subcontractors, suppliers, mobilization and all other cost including overhead and profit necessary to complete the project based on construction plans per APWA standards, Welby Jacob Canal Company requirements, and City specifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents