Similar Projects
Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Grayson Repowering Project - Demolition and Site Improvement
Demolition, Infrastructure
Bidding
$100,000,000 CJ est. value
Glendale, CA 91201

Install JPCP(RSC), LCB Rapid Setting, Class 3 AB, Slab Replacement
Infrastructure
Bidding
$120,000,000 CJ est. value
Palmdale, CA 93551

VAGLA Healthcare Server Room And Site Communication Infrastructure
Infrastructure, Alteration
Post-Bid
Los Angeles, CA 90073

One Time Clean Up And Landscape Maintenance
Term Contract, Alteration
Post-Bid
$53,464 est. value
Los Angeles, CA 90066

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Results
$1,500,000 est. value
Baldwin Park, CA 91797

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Results
$1,500,000 est. value
Baldwin Park, CA 91797

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure - 195,000 SF
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
West Hollywood, CA 90046

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Los Angeles, CA 90024

Last Updated 10/25/2022 12:03 AM
Project Title

Avenue R and 45th Street East Traffic Signal and Roadway Improvements

Physical Address View project details and contacts
City, State (County) Palmdale, CA 93552   (Los Angeles County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,230,050 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of street improvements and a new traffic signal system at the intersection of Avenue R and 45th Street East in the City of Palmdale. The work may consist of but is not limited to: temporary traffic control plan development; temporary traffic control implementation and maintenance; public notification and convenience; construction surveying and staking; erosion control plan / SWPPP development and implementation; earthwork including dirt/soil removal, cut and fill, and excavation; demolition & disposal; asphalt concrete mill and overlay, leveling courses, and new street construction for roadway widening; curb ramp construction and modification; concrete curb, curb return, gutter, and sidewalk construction and modification; construction and modification of street drainage improvements including cross gutters, box culvert, local depression, and existing catch basin connection; conduit installation for future street lighting; timely procurement and provision of materials and appurtenances; utility coordination; utility adjustments and improvements; and signing and striping improvements. Bid Valid 60 calendar days after bid opening date Liquidated Damages $4,000 per calendar day Estimated Bid Value 1100000 Start/Delivery Date Order long lead time materials immediately after award (Sept. 2022); Start construction in Jan. 2023 (estimate only) Project Duration 90 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 07/28/2022 2:00 PM (PDT)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents