Last Updated | 10/25/2022 12:03 AM |
Project Title | Avenue R and 45th Street East Traffic Signal and Roadway Improvements |
Physical Address | View project details and contacts |
City, State (County) | Palmdale, CA 93552 (Los Angeles County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,230,050 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of street improvements and a new traffic signal system at the intersection of Avenue R and 45th Street East in the City of Palmdale. The work may consist of but is not limited to: temporary traffic control plan development; temporary traffic control implementation and maintenance; public notification and convenience; construction surveying and staking; erosion control plan / SWPPP development and implementation; earthwork including dirt/soil removal, cut and fill, and excavation; demolition & disposal; asphalt concrete mill and overlay, leveling courses, and new street construction for roadway widening; curb ramp construction and modification; concrete curb, curb return, gutter, and sidewalk construction and modification; construction and modification of street drainage improvements including cross gutters, box culvert, local depression, and existing catch basin connection; conduit installation for future street lighting; timely procurement and provision of materials and appurtenances; utility coordination; utility adjustments and improvements; and signing and striping improvements. Bid Valid 60 calendar days after bid opening date Liquidated Damages $4,000 per calendar day Estimated Bid Value 1100000 Start/Delivery Date Order long lead time materials immediately after award (Sept. 2022); Start construction in Jan. 2023 (estimate only) Project Duration 90 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 07/28/2022 2:00 PM (PDT) |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |