Similar Projects
D/B - Rehabilitation of Colonial Parkway, Phase I
Renovation, Infrastructure
Design
$100,000,000 to $150,000,000 est. value
Williamsburg, VA 23185

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Wallops Island Causeway Bridge Rehabilitation Project VA ST NASA 1(8)
Results
VA 23359

LS 3-3 Pipe Bridge Upgrade/Replacement
Results
VA

Hampton Roads District Movable Bridges
New Construction, Infrastructure
Post-Bid

Barrier Gate Arms - Berkley Bridge
New Construction
Results

Bridge Timbers
New Construction, Infrastructure
Post-Bid
Capron, Waverly, VA 23890

Steel Rolled Beams Superstructure
New Construction
Results

SGR - Bridge Replacement
New Construction, Infrastructure
Results
$2,153,000 est. value
VA

Cca Treated Bridge Timbers
New Construction, Infrastructure
Results
Chesapeake, Franklin, Hampton, Newport News, Norfolk, Poquoson, Portsmouth, Suffolk, Virginia Beach, Williamsburg, VA 23434

SGR - Bridge Replacement Over Burnt Mill Swamp
New Construction, Infrastructure
Results
$1,257,000 est. value
VA

Bridge Rehab Over Blackwater River
New Construction, Infrastructure
Results
$4,018,000 est. value
VA

On Call Bridge Deck Repair
New Construction, Infrastructure
Results
$2,998,000 est. value
VA

Under Bridge Inspection Equipment
New Construction, Term Contract, Infrastructure
Results

Last Updated 05/31/2022 01:51 AM
Project Title

Bridge Timbers

Physical Address View project details and contacts
City, State (County) (Accomack, Greensville, Isle of Wight, James City, Northampton, Southampton, Surry, Sussex, York Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish And Deliver 5” x 10” x 26’ Long Bridge Decking Timbers Dressed And Full Cut Cca Treated Lumber And 12” x 12” x 26’ Long Bridge Cap Timbers Undressed And Cca Treated.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents