Similar Projects
Holt Fire Station
New Construction - 2,774 SF
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL 32750

Brickell City Centre Fire Station - Shell
New Construction - 6,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Tallahassee Police Headquarters
New Construction
Design
Tallahassee, FL

Construction Manager at Risk for Fire Station 6
Renovation, Addition
Bidding
Highland Beach, FL 33487

Beulah Fire Station Construction
New Construction - 14,503 SF
Bidding
$719,948 est. value
Cantonment, FL 32533

Clearwater Police Department District 3 Substation
Renovation - 27,000 SF
Post-Bid
Clearwater, FL

CM for Various Capital Improvement Projects(Fire Rescue Reno)
Renovation
Post-Bid
$20,000 to $4,000,000 est. value
FL

Sheriff`s District 2 Administration and Operations Center
New Construction - 51,000 SF
Results
Less than $21,000,000 est. value
Bunnell, Palm Coast, FL 32137

Construction Manager at Risk for The Police Department Training Facility
New Construction
Results
Cape Coral, FL

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Winter Haven Fire Station No. 3 / Public Safety Facility
New Construction
Construction
Winter Haven, FL

New East End Police Substation
New Construction
Pending Verification
$12,600,000 est. value
Panama City Beach, FL

New Fire Training Tower
New Construction
Pending Verification
$11,000,000 est. value
Panama City Beach, FL

New Police Headquarters
New Construction, Renovation
Conception
$36,000,000 est. value
Fort Myers, FL 33916

Reported 03/25/2022 12:00 AM
Project Title

Austin Tindall Fire Station

Physical Address View project details and contacts
City, State (County) FL   (Osceola County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: New Construction of a 12,290 SF, (4) Bay Fire Station consisting of concrete tilt panels, pre- engineered light gauge steel trusses, standing seam metal roofing, doors, windows, overhead sectional doors, mechanical yard enclosure, dumpster enclosure, lift station, fueling station, civil sitework, concrete pavement, landscaping, irrigation, electrical, plumbing, mechanical, fire protection, and interior framing and finishes.

Details

Fire/Police Station, Approximately 112,290 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents