Similar Projects
Last Updated | 10/12/2023 07:32 AM |
Project Title | Washington Secondary Bike Path Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Warwick, RI 02889 (Kent County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rhode Island Contract Number 2023-CH-024, Rhode Island Federal Aid Project Number STP-CARB(007), is for Washington Secondary Bike Path Resurfacing within a 10-mile corridor from Whitford Street in Coventry to Depot Avenue in Cranston. The project includes the following work: repairing and resurfacing pavement along the bike path; milling and resurfacing pavement across bridges; restoring and stabilizing eroded shoulders and slopes; cleaning and restoring drainage swales, pipes, and structures; replacing signing and striping; replacing pedestrian signals; installing new curb access ramps; replacing fence; installing and maintaining erosion controls; maintaining and protecting traffic; and providing all incidentals required to complete the work. Vendor Q&A Start Date: September 29, 2023 at 11:15:00 Am Edt Vendor Q&A End Date: October 15, 2023 at 12:00:00 Pm Edt RIDOT: Washington Secondary Bike Path Resurfacing |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |