Similar Projects
Berkley Road Water Treatment Plant - Well No. 3
Infrastructure
Bidding
Auburndale, FL 33823

Southwest Water Treatment Plant Production Well 3 Construction and Testing
Infrastructure
Bidding
$1,500,000 est. value
FL

Wet Well Cleaning
Post-Bid
North Port, FL

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

As Needed Domestic Well Drilling Services
Term Contract
Bidding

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

Submersible Pumps
Infrastructure
Bidding
Panama City Beach, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

Wellfield Rehabilitation, Maintenance and New Construction
Results
Wellington, FL 33414

Lift Stations Hardening Project Equipment Only
Infrastructure
Bidding
FL

Flygt and ABS Pumps, Parts and Repairs
Post-Bid
FL

Well Cleaning and Maintenance Services
Results
Less than $481,800 est. value
Key Biscayne, FL 33149

Reported 05/04/2022 12:00 AM
Project Title

Construction Services for Well 3 at Water Treatment Plant 2

Physical Address View project details and contacts
City, State (County) Mount Dora, FL 32757   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes the furnishing of all labor, materials and equipment for the new construction of an additional potable water well at the City’s Water Treatment Plant #2 located at 1600 Niles Road, Mount Dora FL 32757. Contractor shall provide all labor, equipment and materials as required to provide a complete and functional well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents